Procurement Summary
State : Maharashtra
Summary : Carrying out Feasibility Study, Topographical Survey, Geotech Investigation, Preparation and Submission of Concept Plan, General Arrangement Drawing (Gad), Detailed Design, Drawing, Structural Design, ...
Deadline : 29 May 2024
Other Information
Notice Type : Tender
TOT Ref.No.: 100890593
Document Ref. No. : DYCECST172
Competition : NCB
Financier : Self Financed
Purchaser Ownership : Public
Document Fees : Refer Document
Tender Value : ₹ 8338236.77
EMD : ₹ 166800.00
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Carrying out Feasibility Study, Topographical Survey, Geotech Investigation, Preparation and Submission of Concept Plan, General Arrangement Drawing (GAD), Detailed Design, Drawing, Structural design, Detailed Estimates and Tender document for Complete ROB With both Approaches for the construction of 6(Six) Nos. Road Over Bridges in the Western Railway under the jurisdiction of Dy.Chief Engineer(C)Surat.
- Miscellaneous items which are not covered in above of WR USSOR-2021 scheduled items, but are necessary to be executed to complete work successfully in all respect. S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Schedule B-NS Items 7082682.00 Above/ Below/Par 1 NS1 6.00 Job 554850.00 3329100.00 AT Par 3329100.00
Contract Type : Works
Tender Type : Open
Advertised Value : 8338236.77
Bidding Style : Single Rate for Each Schedule
Bidding System : Single Packet System
Pre-Bid Required : No
Pre-Bid Query Date Time : Not Applicable
Tendering Section : ESTIMATE
Bidding Unit :
Publishing Date / Time : 06/05/2024 17:33
Period Of Completion : 3 Months
Bidding Start Date : 15/05/2024
Closing Date Time : 29/05/2024 11:00
Validity of Offer ( Days) : 60
Are Joint Venture (JV) firms allowed to bid : -
Tender Doc. Cost (Rs.) : 0.00
Earnest Money (Rs.) : 166800.00
Documents
Tender Notice
viewNitPdf_4559896.pdf
T.No.Dy.CECST172TechnicalCondition.pdf
GCC2022.pdf
CS1GCCAPRIL2022.pdf
CS2GCCAPRIL2022.pdf
CS3CorrectionSlipNo_3ACS-3.pdf
CS4CorrectionSlipNo_4ACS-4.pdf
CS5CorrectionSlipNo_5ACS-5.pdf
CS6CorrectionSlipNo_6ACS-61.pdf
CorrectionSlipAnnexVI.pdf
AnnexureVIA.pdf
SystemofVerificationofTendererCredentials.pdf
AnnexureEChecklistROB1.pdf