Procurement Summary
State : Madhya Pradesh
Summary : Operation and Maintenance of (Stp) Sewage Treatment Plant at Crws, Bhopal.
Deadline : 20 Aug 2024
Other Information
Notice Type : Tender
TOT Ref.No.: 104489891
Document Ref. No. : WCR-CRWS-STP-24-21
Competition : NCB
Financier : Self Financed
Purchaser Ownership : Public
Document Fees : Refer Document
Tender Value : ₹ 4178207.04
EMD : ₹ 83600.00
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Operation and Maintenance of (STP) Sewage Treatment Plant at CRWS, Bhopal. (730 Days). Note: The works contract shall include Labor, all the material/chemicals required for day to day operation of plant, spares/standby needed from time to time for effective and ensuring round the clock working of all machinery installed in the plant, PPEs to staff engaged in STP operation. The contract shall also include monthly testing of treated water test report from central Govt./state Govt. test Lab only as evidence of satisfactory running of STP and Sludge deposited in the Clarifier is to be disposed off on monthly basis on the site prescribed/nominated by MPPCB/Municipal corporation/local bodies under the pollution norms.
Contract Type : Works
Tender Type : Open
Advertised Value : 4178207.04
Bidding Style : Single Rate for Tender
Bidding System : Single Packet System
Pre-Bid Required : No
Pre-Bid Query Date Time : Not Applicable
Tendering Section : WORKSHOP
Bidding Unit : Above/Below/Par
Publishing Date / Time : 20/07/2024 10:12
Period Of Completion : 24 Months
Bidding Start Date : 06/08/2024
Closing Date Time : 20/08/2024 15:00
Validity of Offer ( Days) : 120
Are Joint Venture (JV) firms allowed to bid : -
Tender Doc. Cost (Rs.) : 0.00
Earnest Money (Rs.) : 83600.00
Documents
Tender Notice
viewNitPdf_4648484.pdf
2018_CE-I_CT_9Date04_06_2018.pdf
GeneralConditionsofContractApr2022.pdf.pdf
2022_CE-I_CT_GCC-2022Policy14_07_20221.pdf
GCC_AdvanceCorrectionSlip-No.2_13.12.2022.pdf
GCCCORRECTIONSLIPNO3.pdf
ANNEXUREVCERTIFICATETOBEUPLOADED-1-2.pdf
ANNEXUREVACERTIFICATETOBEUPLOADED-3.pdf
RETIREDRAILWAYEMPLOYEEDECLARATIONANNEXURE.pdf
ETENDER-DOC-STP-24-21.pdf