Procurement Summary
State : Tamil Nadu
Summary : Salem Division: Online Monitoring and Control of Electrical Assets by Implementing Iot Devices.
Deadline : 10 Jun 2024
Other Information
Notice Type : Tender
TOT Ref.No.: 101096836
Document Ref. No. : SA-E2-2024-25-W1
Competition : NCB
Financier : Self Financed
Purchaser Ownership : Public
Document Fees : Refer Document
Tender Value : ₹ 15026612.00
EMD : ₹ 225100.00
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Supply, Installation Testing and Commissioning of Intelligent Field Device(IFD) having inbuilt energy metering, Analog Inputs, Digital Inputs, Digital Outputs, GPRS communication/ethernet, LAN, Wi-Fi, etc., display along with filter power circuit having fuses, AC to DC power supply providing adequate DC Supply options (Viz. 5V/12V/24V etc) with battery back for monitoring and control of Pumps, 30-70% Lighting, Street Light(s), Lift(s), Escalator(s), Substation, etc. capable of monitoring & control electrical parameters, sensors parameters with necessary control capability through internet cloud computing along with integration with CRIS Software and hosted at Tier III level secured Data center as per Technical specifications Attached-IFD (1 x 1) 2 2 24.00 Numbers 149289.00 3582936.00 AT Par 3582936.00 Rs.
Contract Type : Works
Tender Type : Open
Advertised Value : 15026612.00
Bidding Style : Single Rate for Each Schedule Item
Bidding System : Single Packet System
Pre-Bid Required : No
Pre-Bid Query Date Time : Not Applicable
Tendering Section : ELEC. GENL
Bidding Unit :
Publishing Date / Time : 10/05/2024 18:07
Period Of Completion : 6 Months
Bidding Start Date : 27/05/2024
Closing Date Time : 10/06/2024 15:00
Validity of Offer ( Days) : 60
Are Joint Venture (JV) firms allowed to bid : -
Tender Doc. Cost (Rs.) : 0.00
Earnest Money (Rs.) : 225100.00
Documents
Tender Notice
viewNitPdf_4561059.pdf
e_Tender_Guidelines.pdf
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27.04.22.pdf
3NEFT_FORM.pdf
SpecialCondition1.pdf
Special_Condition_II.pdf
5.Correction_Slip_1_of_GCC.pdf
6.Correction_Slip_2_of_GCC_1.pdf
correctionslip3.pdf
correctionslip4.pdf
InsttotenderersOM.pdf
CRISGuidelinesforIRNIYANTRAC2.pdf
TechnicalSpecificationsForIFD.pdf
SpecificationsForUltrasoniclevelsensorRelayandRelaybaseCurrentTransformerandFlexiblecoppershieldedcable.pdf