Procurement Summary
State : Uttar Pradesh
Summary : Supply and Installation of 3 Phase Hog Sequence Testing Kit with 60Kva
Deadline : 03 Mar 2025
Other Information
Notice Type : Tender
TOT Ref.No.: 114223944
Document Ref. No. : 10255264
Competition : NCB
Financier : Self Financed
Purchaser Ownership : Public
Document Fees : Refer Document
Tender Value : Refer Document
EMD : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Supply and Installation of 3 Phase HOG Sequence Testing Kit with 60KVA Transformer for ins pection of LHB AC and Non-AC coaches with following specifications. 1) HOG Sequence testing kit shall be s uitable for input supply of 3 phase, 415V with neutral, 125A four poles MCCB shall be provided for input su pply side protection alongwith suitable rated supply chord (PVC) of length 5 meters. 2) HOG sequence testi ng kit shall be having output supply provision of 3 phase, with neutral, 750V, AC with...
Contract Category: Expenditure
Contract Type : Goods
Tender Type : Open - Indigenous
Contract Category : Expenditure
Evaluation Criteria : Itemwise/Consigneewise
Bidding System : Single Packet
Pre-Bid Conference Required : No
Pre-Bid Conference Date Time : Not Applicable
Tendering Section : GKPD
Inspection Agency : TPI Agency
Publishing Date / Time : 04/02/2025 15:06 Item Category General
Procure From Approved Sources : No
Approving Agency : Not Applicable
Closing Date Time : 03/03/2025 11:30
Validity of Offer ( Days) : 90
Ranking Order for Bids : Lowest to Highest
Advertised Value :
Tender Doc. Cost (INR) : 0.00
Earnest Money (INR) : 0.00
Consignee SSE/ACC/W/GKP, NER Uttar Pradesh 1.00 Set
Inspection Details Stage Inspection Not Required
Documents
Tender Notice
viewNitPdf_4855852.pdf
5129864.pdf