Procurement Summary
State : Delhi (NCT)
Summary : Supply, Installation, Testing and Commissioning of Integrated Upgradable Console with Gps Based Papis (Public Announcement and Passenger Information System) and Led / Lcd Destination Board over Indian...
Deadline : 01 Mar 2024
Other Information
Notice Type : Tender
TOT Ref.No.: 94423967
Document Ref. No. : 07235090
Competition : NCB
Financier : Self Financed
Purchaser Ownership : Public
Document Fees : Refer Document
Tender Value : Refer Document
EMD : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Supply, Installation, Testing and Commissioning of Integrated Upgradable Console with GPS based PAPIS (Public Announcement and Passenger Information System) and LED / LCD Destination Board over Indian Railway as per RDSO Specification RDSO/CG- 18001 (Rev.2) OR Latest
Supply, Installation, Testing and Commissioning of Integrated Upgradable Console with GPS based PAPIS (Public Announcement and Passenger Information System) and LED / LCD Destination Board over Indian Railway as per RDSO Specification RDSO/CG-18001 (Rev.2) OR Latest for 1AC Coaches. (Fitment of system shall be done in in-service coaches). FITMENT OF DESTINATION BOARD SHALL BE SUNK-IN TYPE. [ Warranty Period: 78 Months after the date of delivery ]
Contract Category: Expenditure
Contract Type : Goods
Tender Type : Open - Indigenous
Contract Category : Expenditure
Evaluation Criteria : Groupwise
Bidding System : Two Packet
Pre-Bid Conference Required : Yes
Pre-Bid Conference Date Time : 31/01/2024 11:30
Tendering Section : P07
Inspection Agency : TPI Agency
Publishing Date / Time : 29/12/2023 11:00
Procure From Approved Sources : Yes
Approving Agency : RCF
Closing Date Time : 01/03/2024 11:00
Validity of Offer ( Days) : 180
Ranking Order for Bids : Lowest to Highest
Advertised Value :
Tender Doc. Cost (INR) : 0.00
Earnest Money (INR) : 5000000.00 Initial Financial Offer Required Yes Auto Elimination rules applicable For all vendors (Bulk/developmental) Initial Cooling Off Period (HH:MM) 02:00 Subsequent Cooling Off Period (HH:MM) 00:30 Succesive Lots Closing Interval (Min.) 30 Minimum Decrement (%) 0.10 Vendor Categories Bulk/Developmental Item Category General Allow Next Bid Lower Than Current Lowest Bid (Subject to Min. Decrement)
Documents
Tender Notice
viewNitPdf_4439613.pdf
4563060.pdf
4563065.pdf
4563068.pdf
4735897.pdf
4563342.pdf
4722469.pdf
4735896.pdf
4675045.pdf