Procurement Summary
Country : USA
Summary : 1. Remove Existing 25-Ton R-22 Air Handling Unit And Condensing Unit And Replace With New. Remove All Associated Refrigerant Line Sets And Replace With New. Connect To Existing Ductwork Within The Lim...
Deadline : 17 Apr 2025
Other Information
Notice Type : Tender
TOT Ref.No.: 116430559
Document Ref. No. : 274-ES-FO-FY25-BILTMOREHILLSHVAC
Competition : ICB
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
1. Remove Existing 25-Ton R-22 Air Handling Unit And Condensing Unit And Replace With New. Remove All Associated Refrigerant Line Sets And Replace With New. Connect To Existing Ductwork Within The Limits Of The Existing Mechanical Room. 2. Integrate New Condensing Unit And Air Handling Unit Into Building Automation System. 3. Provide New Variable Frequency Drive For New Air Handling Unit. 4. Provide New Duct Mounted Co2, Humidity, And Smoke Detector For Air Handling Unit And Integrate Back Into Building Automation System And Fire Alarm. 5. Provide New Motorized Dampers For Relief, Return, And Outside Air Control For Economizing. 6. Provide New Hot Water Piping Control Valves And Coil Connection For Air Handling Unit Hot Water Coil. Integrate New Control Valves Into Building Automation System. 7. Provide New Heavy Duty Fusible Disconnect For Condensing Unit/Air Handling Unit And Connect To Existing Power. 8. Provide Pre/Post-Construction Test And Balance. 9. Provide New Vykon Jace 9000. 10. Provide New Bacnet Ip Controllers For Existing Vav Terminals, (2) Packaged Units, And Boiler Plant.
Biltmore Hills Community Center â HVAC Replacement
Distribution and conditioning system equipment maintenance and repair services
Posted Date : 3/19/2025
Documents
Tender Notice
274-ES-FO-FY25-BiltmoreHillsHVAC.pdf