Procurement Summary
Country : Switzerland
Summary : 105t and 16t and 16t Power Power Plants Etzelwerk (altendorf, Schwyz) Swiss Federal Railway Cff Production Travelers, Pp-f-ek-pjek
Deadline : 16 Apr 2024
Other Information
Notice Type : Tender
TOT Ref.No.: 98352764
Document Ref. No. : 1399115
Competition : ICB
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
To replace the two 60 t roller bridges from the machine room from the Etzelwerk (Schwyz) power plant, we have to acquire a 105 t two -tone roller bridge and an additional 16 t roller bridge capacity Dump. CFF wishes to transform the Etzelwerk power station and replace the groups of machines 1 to 3. For these works, the two rolling bridges are key elements and must work perfectly. The overall course of the project includes the stages below. - Engineering- Project study- Disassembly and elimination of existing bridges (2x60t)- Production, delivery and assembly- put into service, including CE certification and all the authorizations necessary for the operation- Final reception, including the documentation- Training- Maintenance and maintenance
Applicant service/contracting entity: Swiss federal railways CFF Production Travelers Organizer/Organizing entity: Swiss Federal Railways CFF Production Travelers, PP-F-EK-PJEK, for Olivier Laurenza, Wylerstrasse 123, 3000 Bern 65, Switzerland, telephone: +41 79 634 48 17, e-mail: olivier.laurenza@sbb.ch, url www.sbb.ch
Publish Date: 07.03.2024
Subject of the market
2.1 Title of the market project: 105T and 16t and 16t and 16T power plants Etzelwerk (Altendorf, Schwyz)
2.3 Common vocabulary of public procurement:
2.4 Object and extent of the market: To replace the two 60 t roller bridges from the machine room from the Etzelwerk power plant (Schwyz), we have to acquire a 105 t two -tone roller bridge and a bridge Additional drilling of 16 t of load capacity. CFF wishes to transform the Etzelwerk power station and replace the groups of machines 1 to 3. For these works, the two rolling bridges are key elements and must work perfectly. The overall course of the project includes the stages below. - Engineering- Project study- Disassembly and elimination of existing bridges (2x60t)- Production, delivery and assembly- put into service, including CE certification and all the authorizations necessary for the operation- Final reception, including the documentation- Training- Maintenance and maintenance
2.5 Place of supply: KW ETZELWERK (SZ)
2 ...
Documents
Tender Notice