Procurement Summary
Country : Switzerland
Summary : Architecture and Landscape Architecture Matterhorn Gotthard Infrastructure Ag
Deadline : 14 Jun 2024
Other Information
Notice Type : Tender
TOT Ref.No.: 100829569
Document Ref. No. : 1418049
Competition : ICB
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Zermatt can be reached via the train and a road that requires approval. In the case of larger environmental events (avalanches, stone chips), both traffic routes are often closed, so that Zermatt can only be reached by air. So that the accessibility of Zermatt from Täsch can be ensured in the future, the railway line should be protected from environmental influences. To achieve this goal, a new tunnel between Täsch and Zermatt is planned. The preliminary project was developed and completed at the end of November 2023. An architect and a landscape architect are sought.
Demand/awarding authority: Matterhorn Gotthard Infrastructure AG Creation Center/Organizer: Matterhorn Gotthard Infrastructure AG, to HDN. By Kilian Bumann, Dammweg 80, 3900 Brig-Glis, Switzerland, phone: 0848642442, email: shopping@mgbahn.ch
Publish Date: 04.05.2024
Procurement object
2.1 Service category CPC :: [12] Architecture; Technical advice and planning and integrated technical services; City and landscape planning; associated scientific and technical advice
2.2 Project title of procurement: architecture and landscape architecture
2.3 File number / project number: 390080
2.4 Division in lots?: No
2.5 Community vocabulary:
2.6 The subject and scope of the order: Zermatt can be reached via the train and a road that requires approval. In the case of larger environmental events (avalanches, stone chips), both traffic routes are often closed, so that Zermatt can only be reached by air. So that the accessibility of Zermatt from Täsch can be ensured in the future, the railway line should be protected from environmental influences. To achieve this goal, a new tunnel between Täsch and Zermatt is planned. The preliminary project was developed and completed at the end of November 2023. We are looking for an architect and a landscape architect.
2.7 Location of service provision: The service is provided at the site of the representative. The meetings with the building owner at DE ...
Documents
Tender Notice