Procurement Summary
Country : USA
Summary : Big Bend Depressing Air System Replacement
Deadline : 26 Feb 2024
Other Information
Notice Type : Tender
TOT Ref.No.: 94985811
Document Ref. No. : W9128F24R0044
Competition : ICB
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Description
THIS IS NOT A FORMAL SOLICITATION. This announcement constitutes a PRE-SOLICITATION notice IAW FAR Subpart 5.2.
This PRE-SOLICITATION is for W9128F24R0044.
On or about 24 January 2024, the U.S. Army Corps of Engineers, Omaha District intends to issue a solicitation for “Big Bend Depressing Air Replacement Project”. The solicitation will close on or about 26 February 2024 by 2:00 PM CT.
This solicitation is a Full and Open (Unrestricted) Competition IAW FAR Subpart 6.1.
Site Visit:
A Site Visit will be scheduled and additional information regarding the site visit will be provided in the solicitation. Tentative Site Visit is scheduled for 7 February 2024 at 1000 Trevor McDonald by e-mail at trevor.r.mcdonald@usace.army.mil or telephone at 605-245-1814.
DESCRIPTION OF WORK:
The scope of this project consists of but is not limited to the following work. Omaha District is interested in replacing the current four compressor configuration with two larger 2-stage rotary screw, oil less compressors for the purpose of reducing maintenance and increasing system reliability. The project will aim to decrease the systems recovery time by increasing the compressors capacity (CFM) and the total system storage. This will be accomplished by replacing one damaged accumulator tank and adding two additional accumulator tanks as well as replacing the undersized air supply piping. This will allow two units to go into condensing mode quicker and provide the Big Bend personal the ability to conduct multiple make-up air counts during the condense blow-down cycle as there are typically multiple units operating in order to maintain 100 psi system pressure. An optional back pressure system will also be included.
The duration for this effort is for 365 days from date of award.
MAGNITUDE OF CONSTRUCTION:
The estimated magnitude of construction for this project is between $500, 000 and $1, 000, 000.
NAICS Code:
The Primary North American...
Active Contract Opportunity Notice ID W9128F24R0044 Related Notice Department/Ind. Agency DEPT OF DEFENSE Sub-tier DEPT OF THE ARMY Major Command USACE Sub Command NWD Office W071 ENDIST OMAHA
General Information
Contract Opportunity Type: Presolicitation (Original)
All Dates/Times are: (UTC-06:00) CENTRAL STANDARD TIME, CHICAGO, USA
Original Published Date: Jan 09, 2024 08:21 am CST
Original Response Date: Feb 26, 2024 02:00 pm CST
Inactive Policy: 15 days after response date
Original Inactive Date: Mar 12, 2024
Initiative: None
Classification
Original Set Aside:
Product Service Code: J039 - MAINT/REPAIR/REBUILD OF EQUIPMENT- MATERIALS HANDLING EQUIPMENT
NAICS Code: 238290 - Other Building Equipment Contractors
Place of Performance: Chamberlain, SD 57325 USA
Documents
Tender Notice