Broad Street Substation Switchgear Replacement (Rebid) Tender, USA - 114679254

PUBLIC WORKS has floated a tender for Broad Street Substation Switchgear Replacement (Rebid). The project location is USA and the tender is closing on 26 Mar 2025. The tender notice number is PW#2022-072A - NDA, while the TOT Ref Number is 114679254. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : USA

Summary : Broad Street Substation Switchgear Replacement (Rebid)

Deadline : 26 Mar 2025

Other Information

Notice Type : Tender

TOT Ref.No.: 114679254

Document Ref. No. : PW#2022-072A - NDA

Competition : ICB

Financier : Self Financed

Purchaser Ownership : Public

Tender Value : Refer Document

Purchaser's Detail

Name :Login to see tender_details

Address : Login to see tender_details

Email : Login to see tender_details

Login to see details

Tender Details

Project Description: The City of Seattle seeks Statements of Qualifications (SOQs) from qualified firms to provide Design-Build (DB) services for the Broad Street Substation Switchgear Replacement (RE-BID) Project. All interested firms must sign a Non-Disclosure Agreement (NDA) to access the RFQ and project documents. The NDA is attached to this solicitation. Please email your signed NDA to Ian Hernandez - ian.hernandez@seattle.gov The Project consists of permitting, design, and construction services for a DB Team to demolish and remove the existing metal-clad switchgear and its components from the Project Site. The switchgear consists of Westinghouse air-blast type circuit breakers installed circa 1950. The DB Team must then provide arc-resistant switchgear compatible with the existing substation infrastructure, and which must be assembled and tested prior to delivery. The relays, meters and controls must be provided in the enclosures and pre-wired according to Seattle City Light (SCL) specifications and standards. SCL Substation Crews will install the connections for the control and alarms from the control room to the new switchgear and assist the DB team with performing the relay commissioning. SCL anticipates that the new switchgear will be smaller in scale and size than the current footprint for the existing switchgear. SCL also anticipates that the new switchgear will weigh less than existing. The DB Team must include design and construction services to structurally infill the existing structure as necessary to accommodate the reduced footprint of the new switchgear to match the existing structure and building envelope. Structural work required also includes evaluating the existing structure for supporting both vertical and lateral loads including seismic loading for the new switchgear and upgrading existing components and structures as needed. A firewall adjacent to the existing transformers must be included in the switchgear building or designed as a stand-a...

Documents

 Tender Notice


Procurement Documents for USA

Access a comprehensive library of standard procurement documents specific to USA. Here, you'll find all the essential forms, guidelines, and templates required for tender applications and submissions in USA

Explore Procurement Documents for USA


Want To Bid in This Tender?

Get Local Agent Support in USA and 60 More Countries.

View All The Services


View Tenders By


Publish Tenders


Have Any Dispute With The Purchaser?