Procurement Summary
Country : USA
Summary : Broad Street Substation Switchgear Replacement (Rebid)
Deadline : 26 Mar 2025
Other Information
Notice Type : Tender
TOT Ref.No.: 114679254
Document Ref. No. : PW#2022-072A - NDA
Competition : ICB
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Project Description: The City of Seattle seeks Statements of Qualifications (SOQs) from qualified firms to provide Design-Build (DB) services for the Broad Street Substation Switchgear Replacement (RE-BID) Project. All interested firms must sign a Non-Disclosure Agreement (NDA) to access the RFQ and project documents. The NDA is attached to this solicitation. Please email your signed NDA to Ian Hernandez - ian.hernandez@seattle.gov The Project consists of permitting, design, and construction services for a DB Team to demolish and remove the existing metal-clad switchgear and its components from the Project Site. The switchgear consists of Westinghouse air-blast type circuit breakers installed circa 1950. The DB Team must then provide arc-resistant switchgear compatible with the existing substation infrastructure, and which must be assembled and tested prior to delivery. The relays, meters and controls must be provided in the enclosures and pre-wired according to Seattle City Light (SCL) specifications and standards. SCL Substation Crews will install the connections for the control and alarms from the control room to the new switchgear and assist the DB team with performing the relay commissioning. SCL anticipates that the new switchgear will be smaller in scale and size than the current footprint for the existing switchgear. SCL also anticipates that the new switchgear will weigh less than existing. The DB Team must include design and construction services to structurally infill the existing structure as necessary to accommodate the reduced footprint of the new switchgear to match the existing structure and building envelope. Structural work required also includes evaluating the existing structure for supporting both vertical and lateral loads including seismic loading for the new switchgear and upgrading existing components and structures as needed. A firewall adjacent to the existing transformers must be included in the switchgear building or designed as a stand-a...
Documents
Tender Notice