Construction of 2 Drug Stores in Kabkabiya and Kutum - North Darfur State Tender

GOAL SUDAN has floated a tender for Construction of 2 Drug Stores in Kabkabiya and Kutum - North Darfur State. The project location is Sudan and the tender is closing on 18 Oct 2021. The tender notice number is ELF-P-1276, while the TOT Ref Number is 58095569. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Sudan

Summary : Construction of 2 Drug Stores in Kabkabiya and Kutum - North Darfur State

Deadline : 18 Oct 2021

Other Information

Notice Type : Tender

TOT Ref.No.: 58095569

Document Ref. No. : ELF-P-1276

Competition : NCB

Financier : Other Funding Agencies

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Name :Login to see tender_details

Address : Login to see tender_details

Email : Login to see tender_details

Login to see details

Tender Details

Tenders are invited for Construction of 2 Drug Stores in Kabkabiya and Kutum - North Darfur State

1-Kutum Drug store
1- excavation and building work
1 50.00 ml Excavation work Cost excavation work for strip foundation trench 70cm*50 cm according to the drawings attached.
2 60.00 m3 Backfill Supply materials and backfill the subfloor with gravel and soil with proper and compaction in 20cm layers
Sub
2- concrete work
3 50.00 m l Great beam Supply materials and cast reinforced concrete for great beam section 30cm*33cm with 1:2:4 cement:cement ratio with 6 pcs of 12mm with stirrups of ø6 mm@ 20cm c/c, according to the details in drawings and specifications.)
4 50.00 m l lintel beam Supply materials and cast reinforced concrete for lintal beam section 20cm*33cm with 1:2:4 cement:cement ratio with 4pcs of 12mm with stirrups of ø6 mm@ 20cm c/c, according to the details in drawings and specifications)
5 42.00 m l tied beam Supply materials and cast reinforced concrete for tied beam section 20cm*33cm with 1:2:4 cement:cement ratio, with 4pcs of 12mm with stirrups of ø6 mm@ 20cm c/c, according to the details in drawings and specifications.)
6 12.00 m3 concrete floor Supply materials and casting plain concrete floor 12cm thicknness with 1:2:4 ratio concrete sand gravel with good watering.
Sub
3- bricks and stone works
7 50.00 ml Foundation work Supply materials and build strip foundation with stones and cement, sand mortor 70cm*50cm
8 50.00 ml 2 brick wall supply materials and build 2 brick wall 50cm height, with cement mortor 1:6 with proper watering
9 272.00 m2 1.5 brick wall supply materials and build 1.5 brick wall with sand cement mortar 1:6c with proper watering .
Sub
4 - roofing work
10 3.00 pcs Trusses supply materials and fabricated trusses from 4cm * 8cm * 3mm iron box according to attached drawing
11 130.00 ml purlins Supply material and, weld 3cm*6cm* 1.7mm as purlins on the trusses according to attached drawing
12 140.00 m2 iron sheet Supply materials and fixed .4mm iron sheets on the purlinse according to attached drawing
13 104.00 m2 ceiling roof supply material and fixed manufactory (gypsum ) ceiling roof according to drawing attached and the cost including wire for tying
Sub
5 -windows and doors
14 1.00 each Iron door Supply and fit iron doors ( 2m*2.5m), the door to be fabricated from 4cm x8cm *3mm, externaly and internaly 3cm *6cm, the door should has 2 leafs, to be attached will double 1mm iron sheet hing should be frenche type 4inch, for more details see drawing and specifications attached, price inclusive painting with antirust and pecified color
15 1.00 each Iron door Supply and fit iron doors ( 1m*2.2m), the door to be fabricated from 4cm x8cm *3mm, externaly and internaly 3cm *6cm, the door should has 2 leafs, to be attached will double 1mm iron sheet hing should be frenche type 4inch, for more details see drawing and specifications attached, price inclusive painting with antirust and pecified color
16 1.00 each window supply materials and fit 1m *1.2m iron windows, fabricated from 3cm*6cm *1.7mm, to be attached by 1mm iron sheet and paint with specify color.
17 8.00 each Sky light Supply and install 2 sky light windows 50cm*60cm with 3cm*6cm as frame and sides according to attached drawing
Sub
6 -plastering and painting works
18 560.00 m2 Plastering Supply materials and render fair face plaster on the internal and the external walls with 1:6 cement:lime:sand morter as per specifications with proper water treament.
19 560.00 m2 Painting Supply materials and render painter with white wash and fair face painting (3 coates ) with pomastic on the internal and the external walls to the color specified .
Sub
7 -Electricity work
21 4.00 pcs socket, supply and install eletricity socket, 13A, , the cost including all accessory thing
22 10.00 pcs switch supply and install eletricity switch 2ways, 13A, the cost including all neccessry accessry
23 10.00 psc lamp/lighting supply and install surface lighting (lamp)
24 6.00 pcs ceiling fan supply and installing celing fan, KDK with all accessary item
Sub-total cost for Kutum Drug Store

2-Kabkabia Drug store
1- excavation and building work
1 50.00 ml Excavation work Cost excavation work for strip foundation trench 70cm*50 cm according to the drawings attached.
2 60.00 m3 Backfill Supply materials and backfill the subfloor with gravel and soil with proper and compaction in 20cm layers
Sub
2- concrete work
3 50.00 m l Great beam Supply materials and cast reinforced concrete for great beam section 30cm*33cm with 1:2:4 cement:cement ratio with 6 pcs of 12mm with stirrups of ø6 mm@ 20cm c/c, according to the details in drawings and specifications.)
4 50.00 m l lintel beam Supply materials and cast reinforced concrete for lintal beam section 20cm*33cm with 1:2:4 cement:cement ratio with 4pcs of 12mm with stirrups of ø6 mm@ 20cm c/c, according to the details in drawings and specifications)
5 42.00 m l tied beam Supply materials and cast reinforced concrete for tied beam section 20cm*33cm with 1:2:4 cement:cement ratio, with 4pcs of 12mm with stirrups of ø6 mm@ 20cm c/c, according to the details in drawings and specifications.)
6 12.00 m3 concrete floor Supply materials and casting plain concrete floor 12cm thicknness with 1:2:4 ratio concrete sand gravel with good watering.
Sub
3- bricks and stone works
7 50.00 ml Foundation work Supply materials and build strip foundation with stones and cement, sand mortor 70cm*50cm
8 50.00 ml 2 brick wall supply materials and build 2 brick wall 50cm height, with cement mortor 1:6 with proper watering
9 272.00 m2 1.5 brick wall supply materials and build 1.5 brick wall with sand cement mortar 1:6c with proper watering .
Sub
4 - roofing work
10 3.00 pcs Trusses supply materials and fabricated trusses from 4cm * 8cm * 3mm iron box according to attached drawing
11 130.00 ml purlins Supply material and, weld 3cm*6cm* 1.7mm as purlins on the trusses according to attached drawing
12 140.00 m2 iron sheet Supply materials and fixed .4mm iron sheets on the purlinse according to attached drawing
13 104.00 m2 ceiling roof supply material and fixed manufactory (gypsum ) ceiling roof according to drawing attached and the cost including wire for ting
Sub
5 -windows and doors
14 1.00 each Iron door Supply and fit iron doors ( 2m*2.5m), the door to be fabricated from 4cm x8cm *3mm, externaly and internaly 3cm *6cm, the door should has 2 leafs, to be attached will double 1mm iron sheet hing should be frenche type 4inch, for more details see drawing and specifications attached, price inclusive painting with antirust and pecified color
15 1.00 each Iron door Supply and fit iron doors ( 1m*2.2m), the door to be fabricated from 4cm x8cm *3mm, externaly and internaly 3cm *6cm, the door should has 2 leafs, to be attached will double 1mm iron sheet hing should be frenche type 4inch, for more details see drawing and specifications attached, price inclusive painting with antirust and pecified color
16 1.00 each window supply materials and fit 1m *1.2m iron windows, fabricated from 3cm*6cm *1.7mm, to be attached by 1mm iron sheet and paint with specify color.
17 8.00 each Sky light Supply and install 2 sky light windows 50cm*60cm with 3cm*6cm as frame and sides according to attached drawing
Sub
6 -plastering and painting works
18 560.00 m2 Plastering Supply materials and render fair face plaster on the internal and the external walls with 1:6 cement:lime:sand morter as per specifications with proper water treament.
19 560.00 m2 Painting Supply materials and render painter with white wash and fair face painting (3 coates ) with pomastic on the internal and the external walls to the color specified .
Sub
7 -Electricity work
21 4.00 pcs socket, supply and install eletricity socket, 13A, , the cost including all accessory thing
22 10.00 pcs switch supply and install eletricity switch 2ways, 13A, the cost including all neccessry accessry
23 10.00 psc lamp/lighting supply and install surface lighting (lamp)
24 6.00 pcs ceiling fan supply and installing celing fan, KDK with all accessary item

Closing date for clarifications: 11th October 2021 16:00 Sudanese Time

Closing date for submission: 18th October 2021 16:00 Sudanese Time

1 ITT published 27th September 2021

2 Closing date for clarifications 11th October 2021 - 4 PM Sudanese time

3 Closing date and time for receipt of Tenders 18th October 2021 - 4 PM Sudanese time

4 Tender Opening Location GOAL Sudan Head office | Khartoum

5 Tender Opening Date and time 5th November 2021

Documents

 Tender Notice


Procurement Documents for Sudan

Access a comprehensive library of standard procurement documents specific to Sudan. Here, you'll find all the essential forms, guidelines, and templates required for tender applications and submissions in Sudan

Explore Procurement Documents for Sudan


Want To Bid in This Tender?

Get Local Agent Support in Sudan and 60 More Countries.

View All The Services


View Tenders By


Publish Tenders


Have Any Dispute With The Purchaser?