Procurement Summary
Country : Finland
Summary : Construction of Masalaporti Streets and Municipal Engineering, Phase 2
Deadline : 20 Mar 2024
Other Information
Notice Type : Tender
TOT Ref.No.: 98235407
Document Ref. No. : 135823-2024
Competition : ICB
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : EUR 5000000
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
The construction work includes the renewal of Sundsbergintie between the Masala underpass and Salmitie, the renewal of Salmitie between Sundbergintie and Salmitie 8, and the renewal of Etelaeinen Salmitie between the junction of Sundbergintie and Salmitie 1. A roundabout will be implemented at the intersection of the streets, and the streets will be closedthe stormwater drains will be prevented. The Sundsbergintie retaining wall at the Masala underpass bridge will be renewed. Salmitie will be stabilized with pillars. The site is located in Kirkkonummi in the Ma-sala agglomeration.
Sundsbergintie's retaining wall is a reinforced concrete cast-in-place structure and consists of three parts. The wall is made of compacted muddepending on the rskearina. The nominal length of the retaining wall is 61 m and the maximum height is 1.54 m from the bottom of the foundation slab to the crest of the wall. The wall is 350 mm thick. The width of the foundation slab is 1.5 m and the thickness at the base of the wall is 400 mm.
Note! Explosive-free methods must be used when excavating the retaining wall at the underpass of the trackusing methods such as slug powder and wedges. Vibrations should be measured at the pillars, if a hydraulic hammer, etc. is used. The rock cut here is estimated to be less than 0.5 m.
Between Salmitie and Ring III, a retaining wall and a sight barrier will be built. The retaining wall is a cast-in-place reinforced concrete structure and consists of Viidesfrom the piled corner support masonry block. The retaining wall has been raised 1.5 m above the future ground level, which acts as a visual barrier. Under the retaining wall, mass replacement is carried out with rust-free material and the wall is founded on a compacted gravel grate. NOTE! SALMITIE RETAINING WALL PLANS ARE UPDATED RETAINING WALL...
Document Type: Contract Notice
Reference Number: 492375
Contract Type: works
Estimated Value: 5000000 - EUR
Authority Type: body-pl
Doc Title: Construction of Masalaporti streets and municipal engineering, phase 2
Dispatch Date: 2024-03-05
Publish Date: 2024-03-06
Submission Date: 2024-03-20
Documents
Tender Notice