Procurement Summary
Country : Djibouti
Summary : Dark Fiber Installation and termination project
Deadline : 11 Sep 2023
Other Information
Notice Type : Tender
TOT Ref.No.: 88049936
Document Ref. No. : PR11936220
Competition : ICB
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Tenders are invited for Dark Fiber Installation and termination project.
Your final proposal must be submitted electronically on or before COB September 11 2023 at 16:00 p.m. to djiboutiprocurement@state.gov and copy to ahmedah2@state.gov. The subject of the email should be: PR11936220: Dark Fiber from New CMR to the embassy.
Requirements
2.1 The contractor shall install point to point single mode fiber optic cable from US Embassy
located in haramous to Chief of mission residence located in the plateau de serpent .
estimated distance is seven (7) kilometers .
2.2 Embassy will use their own equipment on both end of the cable, so the contractor should
not install any equipment like router, Media converter or others to might block or interfere
with embassy equipment.
2.3 The Dark fiber should have a minimum of 12 strand fiber of cable .
2.4 Embassy are going to use 4 strand of fiber cable (2 pair ) to connected their various
equipment .
2.5 Spare strand should be available for redundancy .
2.6 Both end of the cable should be terminated inside the embassy Dmarc Room and the CMR
Dmarc room .
2.7 The FOI belongs to the contractor who is responsible for all the maintenances and
emergency repair.
2.8 Embassy will notify the contractor for any issues with the FOI and the contractor should
resolve any issue with FOI within one working day unless is out contractor control.
2.9 The contractor can choose the short and best route for the cable .
2.10 Contractor is responsible for getting all the authorization and approval for the cable
installation.
2.11 Any damage or issues occurred during the installation of the cables will be the
contractor-s responsibility.