PGE DYSTRYBUCJA S.A. has floated a tender for Delivery of Mv Power Cables Divided into 6 Tasks in 2024, Part Ii for the Needs of Pge Dystrybucja S.A.. The project location is Poland and the tender is closing on 12 Apr 2024. The tender notice number is 135139-2024, while the TOT Ref Number is 98195824. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Poland

Summary : Delivery of Mv Power Cables Divided into 6 Tasks in 2024, Part Ii for the Needs of Pge Dystrybucja S.A.

Deadline : 12 Apr 2024

Other Information

Notice Type : Tender

TOT Ref.No.: 98195824

Document Ref. No. : 135139-2024

Competition : ICB

Financier : Self Financed

Purchaser Ownership : Public

Tender Value : Refer Document

Purchaser's Detail

Name :Login to see tender_details

Address : Login to see tender_details

Email : Login to see tender_details

Login to see details

Tender Details

The subject of the order are MV cables with an aluminum working conductor, cross-linked polyethylene insulation and a thermoplastic polyethylene sheath, with a concentric copper return conductor sealed longitudinally and radially

Białystok Branch - cable xRUHAKxS [NA2xS(FL)2Y] 1x120/25 mm2

In accordance with the attachment1 to SWZ

Part 2: Białystok Branch - xRUHAKxS cable [NA2xS(FL)2Y] 1x240/25 mm2

1) Manufacturer's declaration on the possibility of laying the cable using the plowing method without the need for sand sprinkling.

2) For MV cables with cross-linked polyethylene insulation, insulation of the cable cores together with the core shield and the shield andolation should be extruded during one technological operation. 3) Cross-linking of MV cable insulation should be performed using

dry technology in an inert gas atmosphere.

Part 3: Lublin Branch - xRUHAKxS cable [NA2xS(FL)2Y] 1x120/25 mm2

1) Manufacturer's declaration on the possibility of laying the cable musing the plowing method without the need for sand sprinkling.

2) For MV cables with cross-linked polyethylene insulation, the insulation of the cable cores together with the core screen and the insulation screen should be extruded during one technological operation.

3) Cross-linking of MV cable insulation should be performed using dry technologyin an atmosphere of inert gases.

Part 4: Lublin Branch - xRUHAKxS cable [NA2xS(FL)2Y] 1x240/25 mm2

1) Manufacturer's declaration on the possibility of laying the cable using the plowing method without the need for sand spreading.

2) For MV cables in cross-linked polyethylene insulation, insulation of the cable cores together with the core shield and...
Document Type: Contract Notice
Reference Number: POST/DYS/OL/LZA/00366/2024
Contract Type: supplies
Doc Title: Delivery of MV power cables divided into 6 tasks in 2024, part II for the needs of PGE Dystrybucja S.A.
Dispatch Date: 2024-03-04
Publish Date: 2024-03-05
Submission Date: 2024-04-12

Documents

 Tender Notice