PKP POLSKIE LINIE KOLEJOWE S.A. RAILWAY LINES PLANT IN WAŁBRZYCH has floated a tender for Design and Execution of Construction Works as Part of the Project "Digitization of Railway Infrastructure through the Installation of Modern Devices and Systems, Stage 3." Divided into Tasks: Task I: "Mo.... The project location is Poland and the tender is closing on 22 May 2024. The tender notice number is 303222-2023, while the TOT Ref Number is 83273945. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Poland

Summary : Design and Execution of Construction Works as Part of the Project "Digitization of Railway Infrastructure through the Installation of Modern Devices and Systems, Stage 3." Divided into Tasks: Task I: "Mo...

Deadline : 22 May 2024

Other Information

Notice Type : Tender

TOT Ref.No.: 83273945

Document Ref. No. : 303222-2023

Competition : ICB

Financier : Self Financed

Purchaser Ownership : Public

Tender Value : Refer Document

Purchaser's Detail

Name :Login to see tender_details

Address : Login to see tender_details

Email : Login to see tender_details

Login to see details

Tender Details

Design and execution of construction works as part of the project "Digitization of railway infrastructure through the installation of modern devices and systems, stage 3." divided into tasks: Task I: "Modernization of the Zawidow station with the installation of remote control devices according to Wilk"; Task II: "Modernimplementation under Wilk with preparation for the installation of remote control."

Task I:

The subject of the order is the design and construction of modern

relay and computer or computer SRK devices at the Zawidow

station, along with accompanying works on the railway line No. 344 Wilka - Zawidow.The entire subject of the contract includes the execution of:

1) design documentation necessary for the proper execution of all construction works and obtaining all the required opinions, arrangements, admissions, conditions, decisions and permits necessary for the implementation of the subject of the contract;

2)all construction works in accordance with the scope of the contract on the basis of the design documentation developed by the Contractor and approved by the Employer, referred to in the above-mentioned point 1, and all preparatory works necessary to perform the scope of the Agreement and all required activitiesh by law;

3) conducting a conformity assessment of the structural subsystem "Control-Command and Signaling - trackside devices" covered by the scope of the contract at each stage (design, construction

and final tests of the subsystem).

The contract includes the design and execution of the scope of the rail traffic control device...
Document Type : Corrigendum/Additional information (Please refer tender document)
Reference Number : 0663/IZ23GMZ/04817/01304/23/P
Contract Type : Works
45000000 - Construction work
Authority Type : Utilities entity
Type of Procedure : Open procedure
Regulation : European Union
Bid Type : Submissionfor all lots
Doc Title : Construction work
Dispatch Date : 2023-05-17
Publish Date : 2023-05-22
Submission Date : 2024-05-22

Documents

 Tender Notice