Procurement Summary
Country : USA
Summary : FY25 Airfield Striping & Rubber Removal | Dover AFB, DE
Deadline : 21 Mar 2025
Other Information
Notice Type : Tender
TOT Ref.No.: 115815297
Document Ref. No. : FA449725R0007
Competition : ICB
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Description
AMENDMENT 001
Please review all attchements for updated information and new RFP Due date.
The 436 Contracting Squadron is conducting this solicitation to identify contractors who possess the capability to fulfill the requirement specified below:
Description of Service:
The project consists of providing all labor, materials and equipment necessary to remove paint and rubber and to stripe Dover AFB Airfield as well as other heavy-duty pavement striping applications. Specifications include the following:
1. Repaint existing and paint new pavement markings in accordance with the Statement of Work (SOW) and the applicable drawings. A maximum of 290, 000 SF of striping (225, 000 SF-Reflective, 65, 000 SF-non-reflective) shall be accomplished by the Contractor based on a priority list to be provided by the Contracting Officer just prior the Contractor performing the work. The Contractor shall remove built up and flaking markings as required up to a maximum of 12, 000 SF. The contractor may propose to use either Type I or Type III beads in the reflective markings.
2. Rubber removal portion consists of furnishing all labor, equipment, tools, appliances, and materials required to remove 85% of the rubber build up from 100% of the rubber covered within a designated area of runway (area approximately 2500 LF x 65 LF x 3 Runway ends) . The rubber removal is to be completed without damage to the pavement surface, joints, and joint and crack seals, or any other government property.
Site Visit Information: A site visit is not necessary to refine this requirement.
Proposals: Contractors are encouraged to offer their most advantageous/best proposal. The contractor shall submit their proposal by 21 March 2025, no later than 12:00 PM EST to the contracting office by e-mail to all points of contact listed below in order to be considered. Proposals must be valid through for 120 calendar days.
Government POCs:
SSgt Mariah Thompson (302)...
Active Contract Opportunity
Notice ID : FA449725R0007
Related Notice
Department/Ind. Agency : DEPT OF DEFENSE
Sub-tier : DEPT OF THE AIR FORCE
Major Command : AIR MOBILITY COMMAND
Office: FA4497 436 CONS LGC
General Information
Contract Opportunity Type: Solicitation (Updated)
Updated Published Date: Mar 05, 2025 03:25 pm EST
Original Published Date: Feb 07, 2025 03:32 pm EST
Updated Date Offers Due: Mar 21, 2025 12:00 pm EDT
Original Date Offers Due: Mar 07, 2026 12:00 pm EST
Inactive Policy: 15 days after date offers due
Updated Inactive Date: Apr 05, 2025
Original Inactive Date: Mar 22, 2026
Initiative: None
Classification
Original Set Aside:
Product Service Code: Y1BD - CONSTRUCTION OF AIRPORT RUNWAYS AND TAxIWAYS
NAICS Code: 237310 - Highway, Street, and Bridge Construction
Place of Performance: Dover AFB, DE 19902 USA
Documents
Tender Notice
Atch-0-Solicitation-Amendment-FA449725R0007000.pdf
Atch-1a-Airfield-Specifications.pdf
Atch-1b-Airfield-Striping-Rubber-Removal-Drawin.pdf
Atch-2-Wage-Determination_HighwayDE20250004.pdf
Atch-3-Bid-Schedule-FY25-Striping-Rubber-Remova.xlsx
Atch-4-Evaluation-Factors-Best-Value-dtd-5-Mar-2.pdf
Atch-5-Dover-AFB-OPSEC-Awareness-Guide-for-Contr.pdf
Atch-1-SOW-MAPC-Airfield-Striping-Rubber-2025-RE.pdf
Atch-6-DAFB-AT-Awareness-for-Contractors-Trifold.pdf
Atch-7-DAFB-AT-Awareness-Guide-for-Contractors.pdf
Atch-8-FY25-Airfield-Striping-and-Rubber-Removal.pdf