Procurement Summary
Country : USA
Summary : Fy25 Mcon P-693 Pdi: Guam Defense System, Command Center, Joint Region Marianas, Guam
Deadline : 13 Feb 2025
Other Information
Notice Type : Tender
TOT Ref.No.: 113285615
Document Ref. No. : N6274225R1301
Competition : ICB
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Description
The work for this project includes the construction (design-bid-build) of a Guam Defense Radar System Command Center (CC), power generation facility, switchgear building, fuel storage facility, entry control facility, and associated equipment. The CC will include functional areas to accommodate personnel, computing equipment, user interfaces, and communications needed for planning, controlling, and directing mission activities. The power generation facility will provide power via the switchgear facility for the command center and associated infrastructure with fuel from the storage facility consisting of above ground fuel tanks, fuel off-loading infrastructure, and associated containment. The CC facility and power generation facility will be designed for Risk Category IV to meet site specific ground motion and seismic requirements to include base isolation.
Construction scope and methods that will be required as part of this project include, but are not limited to:
Demolition of existing housing units and the associated mitigation/disposal of asbestos, lead contaminated materials, and pesticide contaminated soil Civil site work, including grading, paving, and retaining walls Concrete construction meeting the requirements of ICC-500 Storm Shelter and including coordination of cast-in-place, tilt-up, and precast elements 150 foot Galvanized Steel Antenna Tower and associated foundation Seismic Isolation Bearings requiring a specialized installation procedure and building erection sequence involving extensive construction shoring and bracing Protection measures for nonstructural components, including flex loops for piping & conduit to accommodate seismic movement Security infrastructure includes real property features to support the installation of Security System Level (SSL)-C and Integrated Electronic Security System (IESS), site security measures, entry control, and material procurement & inspection requirements Facilities will be designed t...
Active Contract Opportunity
Notice ID : N6274225R1301
Related Notice : N6274225R1301
Department/Ind. Agency : DEPT OF DEFENSE
Sub-tier : DEPT OF THE NAVY
Major Command : NAVFAC
Sub Command : NAVFAC PACIFIC CMD
Office: NAVFACSYSCOM PACIFIC
General Information
Contract Opportunity Type: Solicitation (Updated)
Updated Published Date: Jan 16, 2025 10:38 am HST
Original Published Date: Oct 30, 2024 04:51 pm HST
Updated Date Offers Due: Feb 13, 2025 02:00 pm HST
Original Date Offers Due: Jan 09, 2025 02:00 pm HST
Inactive Policy: 15 days after date offers due
Updated Inactive Date: Feb 28, 2025
Original Inactive Date: Jan 24, 2025
Initiative: None
Classification
Original Set Aside:
Product Service Code: Y1BG - CONSTRUCTION OF ELECTRONIC AND COMMUNICATIONS FACILITIES
NAICS Code: 236220 - Commercial and Institutional Building Construction
Place of Performance: GU USA
Documents
Tender Notice
Am-0010-Attachment-2_Revised-Drawings_Signed.pdf
Am-0010.pdf
25-1301-CmdCtrl-Notice10.pdf
25-1301-CmdCtrl-Notice9.pdf
25-1301-CmdCtrl-Notice8.pdf
Attachment-1_Revised-Drawings_dtd-13-and-20-Dec-20.pdf
Am-0009.pdf
Am-0008.pdf
Am-0007.pdf
Am-0007-Attachment-1_Revised-Drawings-dtd-13-Dec-2.pdf
Am-0006.pdf
Am-0006-Attachment-1_Revised-Drawings-dtd-6-Dec-20.pdf
Am-0005.pdf
Am-0005-Attachment-1_Revised-Drawings-dtd-11-22-20.pdf
R-P693_Drawings_Final_Vol14.pdf
R-P693_Drawings_Final_Vol14.pdf
25-1301-CmdCtrl-Notice7.pdf
R-P693_Drawings_Final_Vol14.pdf
R-P693_Drawings_Final_Vol14.pdf
R-P693_Drawings_Final_Vol14.pdf
R-P693_Drawings_Final_Vol14.pdf
R-P693_Drawings_Final_Vol14.pdf
P693_Sign-in-Sheets_Redacted.pdf
25-1301-CmdCtrl-Notice6.pdf
25-1301-CmdCtrl-Notice5.pdf
25-1301-CmdCtrl-Notice4.pdf
25-1301-CmdCtr-Notice3.pdf
25-1301-CmdCtrl-Notice2.pdf
25-1301-CmdCtrl-Notice1.pdf
Am-0004.pdf
Am-0004-Attachment-1_Revised-Drawings-dtd-11-15-20.pdf
Am-0003.pdf
Am-0003-Attachment-1_Revised-Drawings-dtd-11-8-202.pdf
Am-0002.pdf
Am-0001.pdf
25-1301-P-693-RFP.pdf
P693_Drawings_Final_Vol14.pdf
P693_Drawings_Final_Vol14.pdf
P693_Drawings_Final_Vol14.pdf
P693_Drawings_Final_Vol14.pdf
P693_Drawings_Final_Vol14.pdf
P693_Drawings_Final_Vol14.pdf
P693_Drawings_Final_Vol14.pdf
P693_Drawings_Final_Vol14.pdf
P693_Drawings_Final_Vol14.pdf
P693_Drawings_Final_Vol14.pdf
P693_Drawings_Final_Vol14.pdf
P693_Drawings_Final_Vol14.pdf
P693_Drawings_Final_Vol14.pdf
P693_Drawings_Final_Vol14.pdf
P693_Drawings_Final_Vol14.pdf
P693_Drawings_Final_Vol14.pdf
P693_Drawings_Final_Vol14.pdf
P693_Drawings_Final_Vol14.pdf
P693_Specs_Final_Vol01_20241007.pdf
P693_Specs_Final_Vol02_20241007.pdf