Procurement Summary
Country : Switzerland
Summary : Inlet Canal Wuelflingen, Ara Bis Weiacherstrasse - Canal Replacement Construction Contract, Order C, Civil Engineering Work
City of Winterthur Department of Construction and Mobility Civil Engineering Office
Deadline : 27 Mar 2024
Other Information
Notice Type : Tender
TOT Ref.No.: 95462711
Document Ref. No. : 1390325
Competition : ICB
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
During the inspection of the main inlet to the Ara Hard, damage was discovered to the sewage steel pipes that cross the Toess. The steel pipes from 1947 were then subjected to a material technology condition examination. The results showed that the 76-year-oldsCarbon steel pipes were and still are exposed to extensive attack on the inside (corrosion) over their service life. The pipe wall inner surfaces were severely weakened by trough corrosion. The critical remaining wall thickness will be reached or fallen below by the end of 2025. in this time periodThe usability suddenly ends. The existing, accessible sewer pipes before and after the pipe bridge are in poor structural condition. The in-situ concrete channels must be replaced depending on their capacity, condition and object.
Requirements office/awarding office: City of Winterthur Department of Construction Procurement office/organizer: City of Winterthur Department of Construction and Mobility Civil Engineering Department, Pionierstrasse 7, 8403 Winterthur, Switzerland, Telephone: 41 (0)52 267 54 72, Email: hanspeter.raebsamen@win.ch
Publish Date :01/19/2024
Procurementgsobjekt
2.1 Type of construction contract: Execution
2.2 Project title of procurement: Wuelflingen inlet canal, ARA to Weiacherstrasse - sewer replacement Construction contract, contract C, civil engineering work
2.3 File number / project number: 51798
2.4 Division into lots?: No
2.5 Community vocabulary:
2.6 Counternd and scope of the order: During the inspection of the main inlet to the ARA Hard, damage was discovered to the steel sewage pipes that cross the Toess. The steel pipes from 1947 were then subjected to a material-technological condition analysis. The results showsen that the 76-year-old sewage steel pipes were and are still exposed to extensive attack on the inside (corrosion) over their service life. The inner surfaces of the pipe walls were severely weakened by trough corrosion. The critical remaining wall thickness will be reached at the end of 2025. belowrstepped. During this period, the usability suddenly ends. The existing, accessible sewer lines before and after the pipe bridge are in poor structural condition. The in-situ concrete channels must be replaced depending on capacity, condition and property...
Documents
Tender Notice