Procurement Summary
Country : Canada
Summary : Installation of Ground Hoist Replacement Phase 3
Deadline : 18 Feb 2025
Other Information
Notice Type : Tender
TOT Ref.No.: 114385889
Document Ref. No. : 880-2024
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
D3.1 The Work to be done under the Contract shall consist of replacement of inground bus lift hoists #2 to #7, including construction of associated structural foundation, pit, grouting, drainage systems, associated utility services to control console (compressed air, electrical) and remote control take-off point (electrical) for hoist operation and associated conduit between control console and hoist pits.D3.2 Work to also include placement and grout-levelling of hoist cassettes and coordination services with hoist supplier.D3.3 Hoist supplier will supply, connect and commission internals of hoist lifts, including console and remote-control units. Includes running of air, hydraulic and electrical cables from control console to hoist cassettes (conduit provided by Contractor)D3.4 The following shall apply to the Services:(a) City of Winnipeg Green Building Policy: New City-Owned Buildings and major additions; http://clkapps.winnipeg.ca/DMIS/DocExt/ViewDoc.asp?DocumentTypeId=2&DocId=5989(b) Universal Design Policy http://clkapps.winnipeg.ca/DMIS/DocExt/ViewDoc.asp?DocumentTypeId=2&DocId=3604
Reference Number : 0000286738
Location : Canada, Manitoba, Winnipeg
Description : D3.1 The Work to be done under the Contract shall consist of replacement of inground bus lift hoists #2 to #7, including construction of associated structural foundation, pit, grouting, drainage systems, associated utility services to control console (compressed air, electrical) and remote control take-off point (electrical) for hoist operation and associated conduit between control console and hoist pits.D3.2 Work to also include placement and grout-levelling of hoist cassettes and coordination services with hoist supplier.D3.3 Hoist supplier will supply, connect and commission internals of hoist lifts, including console and remote-control units. Includes running of air, hydraulic and electrical cables from control console to hoist cassettes (conduit provided by Contractor)D3.4 The following shall apply to the Services:(a) City of Winnipeg Green Building Policy: New City-Owned Buildings and major additions; http://clkapps.winnipeg.ca/DMIS/DocExt/ViewDoc.asp?DocumentTypeId=2&DocId=5989(b) Universal Design Policy http://clkapps.winnipeg.ca/DMIS/DocExt/ViewDoc.asp?DocumentTypeId=2&DocId=3604
Documents
Tender Notice