Procurement Summary
Country : Bangladesh
Summary : Irrigation Infrastructure Materials for Irrigation Scheme.
Deadline : 17 Apr 2024
Other Information
Notice Type : Tender
TOT Ref.No.: 99515144
Document Ref. No. : 12.06.4700.GD.102.1340
Competition : NCB
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Project Name : Not applicable
Information for Tenderer/Consultant :
Eligibility of Tenderer : Eligibility of Tenderer:1. Only local manufacturer who have industrial license of producing distribution Transformer will be allowed to bid this tender.2. Updated ISO standardization certificate of the Manufacturer must be submitted with the offer.3. Manufacturer must have industrial Project registration license issued by the Board of investment Government of Bangladesh, 03 (Three) years over all Manufacturer experience certificate of those particular/respective materials enclosed with the offer.4. The minimum production capacity or availability of equipment is/are: Production capacity of Transformer of the tenderer-s factory must have minimum 10 (Ten) nos per month. The purchaser may send representative to verify the technical and production ability of the manufacturer. The Tenderer will have to bear all cost of factory inspection5. The test of the sample of Transformer of technically & commercially responsive lowest bidder(s) for each lot will be done separately at the laboratory of recognized technical institution as per tender specification and terms-conditions. All costs including handling, carrying & testing will be borne by the supplier. The bidder must pay the test charges to BUET/KUET/MIST for each lot before testing. On test, if the sample fails to confirm the tender specification then the offer will be rejected. In that case if Executive Engineer, BADC desire, sample of 2nd lowest responsive bidder may send for BUET/KUET/MIST test and so on. The bidder must send the sample for BUET/KUET/MIST test within 7 (seven) days of the date of issuing instruction letter.6. Tenderer must do pre-commissioning test (Continuity test, Insulation test, No load test, Full load test & Ratio test etc) of each transformer at recommended palli bidyut samity before submitting in PE office.
Brief Description of Goods and Related Service : Irrigation infrastr...
Documents
Tender Notice