Procurement Summary
Country : Australia
Summary : Kalgoorlie-Boulder Racing Club (Kbrc) Irrigation System Upgrade
Deadline : 23 Aug 2024
Other Information
Notice Type : Tender
TOT Ref.No.: 105122521
Document Ref. No. : C100185
Competition : ICB
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
The Racecourse Irrigation Works Shall Include, But Is Not Necessarily Limited To, The Following:(A) Connection To Existing Discharge Pipework Outside And Downstream Of Existing Pump And Filtrationstation At The Approx. Location Shown On The Drawings.(B) Supply, Installation, Warranty And Commissioning Of All Items Described In The Attachedspecifications And Drawings.(I) All Sprinklers, Pipework, Valving And Associated Fittings.(Ii) Irrigation Control System.(Iii) All Wiring And Associated Fittings(C) The Contractor Shall Note That Other Contracts Will Be Scheduled Concurrently And Must Allow In Theirtender Pricing For The Additional Costs That Arise For The Liaison And Coordination Of Their Work With Allother Contractors &/Or Sub-Contractors On Site.(D) It Is The Responsibility Of The Contractor To Formulate And Submit A Quotation Which Shall Encompass Allof The Work And Materials Which Is Required To Install The Associated Equipment And Materials Requiredfor The Project Works In A Competent, Professional Manner And In Accordance With Standard Industrypractice. Items Of Equipment, Materials, Labour Etc. Shall Not Be Limited To The Materials, Equipmentand/Or Quantities Noted In This Documentation.(E) This Specification And Associated Drawings Have Been Accomplished For The Purpose Of Outlining To Thecontractor The Extent Of The Works Which Are Required By The Principal And The Route And Approximateposition And/Or Location Of Various Elements Of The Project Works.(F) Component Locations And Pipe Work Routing Are Essentially Diagrammatic And Must Be Interpreted Inaccordance With The Scale Of The Drawing, Standard Industry Practice And Actual Site Conditions.(G) Minor Variations To Equipment Locations And Pipeline Routing Will Not Be Considered As Variations Or Extrasto The Contract.
Last date of submission : 23 Aug, 2024 2:30 PM
Documents
Tender Notice