Procurement Summary
Country : Venezuela
Summary : Maintenance Service to the Auxiliary Systems of Petro San Felix's Gta and Gtb Turbogenerators
Deadline : 05 Apr 2024
Other Information
Notice Type : Tender
TOT Ref.No.: 99133303
Document Ref. No. : A-159-24-0023
Competition : ICB
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
THE GENERAL SCOPE OF THIS SERVICE CONTEMPLATES, WITHOUT LIMITING IT, THE SERVICE OF PROFESSIONAL PERSONNEL AND TECHNICAL PERSONNEL, VARIOUS CLEARLY IDENTIFIED MATERIALS AND CONSUMABLES, AS WELL AS THE TOOLS AND EQUIPMENT NECESSARY TO ACHIEVE THE MAINTENANCE SERVICE TO THE AUXILIARY SYSTEMSS OF THE GTA AND GTB TURBOGENERATORS OF PETRO SAN FELIX TO BE EXECUTED IN THE OPERATIONAL AREAS OF PETRO SAN FELIX, S.A., AND EXTERNAL WORKSHOPS OF THE CONTRACTOR, AND INCLUDES, AMONG OTHERS, THE FOLLOWING ACTIVITIES:
• MAINTENANCE OF THE INSTRUMENT AIR COMPRESSOR AND STARTING FROM TURBOGENERATORS TOd0311b314139639afa8d9993705f8a28AND B (GTA AND GTB) SIEMENS SGT-500
• PREVENTIVE MAINTENANCE AND SERVICE OF THE INSTRUMENTS OF THE AIR COMPRESSOR SYSTEM OF THE TURBOGENERATORS.
• REPLACEMENT OF HIGH EFFICIENCY FILTERS IN THE PLENUM AND ALTERNATOR AREA OF THE TURBOGENERATORS.
• REPLACEMENT OF BAG TYPE FILTERS. MODEL G3 1/1 030 7321, 000 MEASUREMENTS 592 MODEL G3 1/2 63 030 7322 000 MEASUREMENTS 287 PLENUM AREA.
• REPLACEMENT OF LOW EFFICIENCY FILTERSNCIA. ALTERNATOR AREA.
• REPLACEMENT AND INSTALLATION OF BATTERY BANK FOR THE DC BACKUP SYSTEM OF THE SIEMENS SGT 500 TURBOGENERATORS FOR TURBINE "A" AND TURBINE "B".
• REPLACEMENT AND INSTALLATION OF 3 TON COMPACT CENTRAL TYPE AIR CONDITIONING FOR THE TURBOGENERATOR CONTROL ROOMd0311b314139639afa8d9993705f8a28DORES "A" AND "B"
• ADEQUACY OF THE FIRE FIGHTING SYSTEM FOR TURBOGENERATORS A AND B (GTA AND GTB) SIEMENS SGT-500 OF PETRO SAN FELIX.
• REPLACEMENT OF TURBOLUB OIL ISO 46 FOR THE SIEMENS SGT-500 TURBOGENERATORS.
• ADAPTATION OF THE MASTER PIECE 200/1 (MP-200) CONTROL SYSTEM FOR TURBOGENEd0311b314139639afa8d9993705f8a28SIEMENS SGT-500 TURBOGENERATORS.
• SUITABILITY OF THE ADVANT AC-110 CONTROLLER FOR THE SIEMENS SGT-500 TURBOGENERATORS.
• REPLACEMENT OF MOTOR AND HYDRAULIC PUMP FOR THE COOLING SYSTEM OF THE SIEMENS SGT-500 TURBOGENERATORS.
• REPLACEMENT OF THE COOLING KIT ENGINE AND HYDRAULIC PUMP HOSES
• REPLACEMENT OF Sd0311b314139639afa8d9993705f8a28N1 AND N3 MAGNETIC PICK SENSOR (TRANSDUCER), PART NUMBER 2404146-2, FOR PETRO SAN FELIX SIEMENS SGT-500 TURBOGENERATORS A AND B (GTA AND GTB).
• UPS REPLACEMENT FOR TURBOGENERATORS A AND B (GTA AND GTB) SIEMENS SGT-500 FROM PETRO SAN FELIX.
• FLAME SENSOR REPLACEMENT (FLAME SENSOR ULd0311b314139639afa8d9993705f8a28TRAVIOLET) HONEYWELL, PART NUMBER 5095210 FOR PETRO SAN FELIX SIEMENS SGT-500 TURBOGENERATORS A AND B (GTA AND GTB).
• COMPLETE GAS SKID HEATER PANEL REPLACEMENT, BRAND: GAUMER, MODEL: S GP4X-90-4 -2CX, 480V / 3PH / 44.4 KW AND REPLACEMENT OF SCR'S.
• REPLACEMENT OF SEAL KIT FORd0311b314139639afa8d9993705f8a28GAS CONTROL VALVE.
• APPLICATION OF BACKGROUND PAINT AND POLYURETHANE PAINT IN THE PLENUM AREA OF TURBOGENERATORS A AND B.
Service
Documents
Tender Notice