Procurement Summary
Country : Iraq
Summary : New Eleven Wells Drilling Rig and Associated Services
Deadline : 04 Jun 2024
Other Information
Notice Type : Tender
TOT Ref.No.: 101080853
Document Ref. No. : CMIT-PRT-10.30-240006
Competition : ICB
Financier : Other Funding Agencies
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Tenders are invited for New Eleven Wells Drilling Rig and Associated Services in Y2024-Y2025
Tender Fee Amount 300 USD
Fail to meet any of below key factors will lead to disqualification:
1) Scope of Business must be related to the scope of work of the tender.
2) Legal Entity and Qualification of Bidder
3) Bid proposals are in properly sealed condition
4) Bid Proposal Period of Validity shall be as required in this
TENDER DATA SHEET (TDS) (aforementioned Clause 11.1).
5) Bid Bond submission
6) Signed & Stamped Cover Letter (as per Section 2 PROPOSAL
CONTENTS AND FORMS, Attachment 2A: Proposal Format of
Cover Letter)
7) Price proposal is separate from Technical & Commercial
proposal.
8) No significant deviation on ITT requirements.
9) Bidder's Financial Health: Meeting Company-s minimum
requirement.
10) Bidder is required to propose all new eleven ( 11) wells drilling
rig and associated services as per lump sum mode.
11) The quantity of proposed rig is at least three (3) rigs with
available time windows from bidder. The rig capacity is required no
less than 2000HP for drilling wells. The rig(s) under manufacturing
will be disqualified.
12) All required rigs shall complete mobilization and spud-in within
four (4) months from the Contract Date.
13) The Bidder is required to propose drilling rigs and personnel,
drilling fluid, cementing, mud logging, wireline logging, directional
drilling, lower completion support service and other associated
services as required in ITT.
14) The manufacture year of Proposed Rigs shall be no earlier than
Y2011.
15) The pressure of mud pumps is no less than 5000psi (or the
capacity no less than 1600 HP) and the quantity is no less than
three (3) sets for each rig.
16) The whole drilling operation duration (from the first well spud in
to the last well hand over to completion, excluding lower completion
duration) with Rigs Moves between well-sites shall be within
fourteen and half (14.5) months.
17) Bidder shall submit the Third-Party Inspection (TPI) certificates
for rigs and the International Association of Drilling Contractors
(IADC) certificate, otherwise, bidder shall provide an official
commitment letter signed and stamped promising to provide the
certificates after contract award. The TPI company shall follow the
requirement of MOC and MoO.
18) Contractor's past performance evaluation in Missan Oilfield, only
bidders with qualified performance record and new bidders to
Missan oilfield shall be considered qualified.
Bid bond: 1, 000, 000 USD (One Million US Dollars), The Bid Bond must be presented to Company in a separated and sealed envelope and duly marked and stamped on outer envelope.
Documents
Tender Notice