Procurement Summary
Country : Australia
Summary : Northern Endeavour Branch Technical Advisers
Deadline : 22 Mar 2023
Other Information
Notice Type : Tender
TOT Ref.No.: 79267022
Document Ref. No. : NEB-0223-02
Competition : ICB
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
The Northern Endeavour Branch (NEB) was established in March 2020 to investigate and progress a long-term handling strategy for the Northern Endeavour FPSO and associated Laminaria-Corallina field facilities and infrastructure due to disclaiming of certain property by Timor Sea Oil and Gas Australia Pty Ltd (TSOGA). The FPSO is permanently moored in 380m of water in the Timor Sea, approximately 550km WNW from Darwin, Australia and 250km ESE from Kupang, West Timor. The FPSO is located in Block AC/L5 within the Australian Commonwealth-s Territory of the Ashmore and Cartier Islands. The field is located in a water depth range between 356m at Laminaria to 410m at Corallina. This requires the use of driverless tie-in and intervention techniques for maintenance, inspection and field development. In non-production mode, the now redundant production system comprises a network of subsea wells tied back to the permanently moored vessel unit through a system of subsea manifolds, flowlines, umbilicals, and dynamic risers. Produced oil was stored onboard the vessel and unloaded via offtake tankers using a tandem mooring system. The FPSO is shut in with no further production being undertaken. The Facility is depressurised, and all wells are shut in with Subsurface Safety Valves closed. The NEB has identified an ongoing need for two technical advisers to provide reliable and timely information on Phase 2 (plugging and abandonment) and Phase 3 (removal of subsea infrastructure) activitie...
Documents
Tender Notice