Procurement Summary
Country : USA
Summary : Northport Mill and Fill Project. No. 632-25-001
Deadline : 25 Mar 2025
Other Information
Notice Type : Tender
TOT Ref.No.: 116295145
Document Ref. No. : 36C24225B0009
Competition : ICB
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Description
RFI Responses time frame and possible extension of time   As per notes on solicitation this scope of work is to be completed on weekends starting from Friday 7pm,   Can we work throughout the weekend 2-3 shifts? what are the allowable hours of work?For parking lot Q, you can work throughout the entire weekend, starting on Friday 5:00PM Sunday 5:00AM. Will there be any extension of the time frame? We can extend based on what you might propose if current timeframe is not realistic. Will the three (3) lots be available at the same time and for the duration of the project?        As per the scope of work, All work can be completed during normal business hours of Monday Friday 8:00AM 5:00PM except for Parking Lot Q, which is to be completed from Friday 5:00PM Sunday 5:00AM. Each parking lot will be done in separate phases. sidewalk and curd details and specs throughout all three (3) lots Can you provide details and specs for the sidewalk? PCI of the concrete? Wire mesh or not? Thickness?? Any bedding??Sidewalk thickness is 4-inch. Match existing. 6 x 6 W2.9 x W2.9 wire welded fabric. Use RCA to level out the elevation for the bottom of the sidewalk. See attached for sidewalk detail.Can you provide any details and specs for the curbs? Hight above and below ground? Rebar? PCI of concrete?6 x 18 One #5 continuous rebar at the top of the curb attached to a #4 at 24 vertical dowel. See attached for curb detail. LOT C- proposed new concrete sidewalkProposed new sidewalk will be about 8-12 below existing soil grade. Is there any detail that will address the difference in elevation? Grade the remaining of the area? Install knee wall?Grade the remaining area. Fire Hydrant relocation will be performed by FD, or should we include it in our scope?? Who is doing the shut off? Any requirements by Fire Department for alternating the location of this Fire Hydrant?? FD will be doing the shut off but will not be doing the relocation. Please include in your sc...
Active Contract Opportunity
Notice ID : 36C24225B0009
Related Notice
Department/Ind. Agency : VETERANS AFFAIRS, DEPARTMENT OF
Sub-tier : VETERANS AFFAIRS, DEPARTMENT OF
Office: 242-NETWORK CONTRACT OFFICE 02 (36C242)
General Information
Contract Opportunity Type: Solicitation (Updated)
Updated Published Date: Mar 14, 2025 06:42 pm EDT
Original Published Date: Feb 12, 2025 09:48 am EST
Updated Date Offers Due: Mar 25, 2025 10:00 am EDT
Original Date Offers Due: Mar 05, 2025 10:00 am EST
Inactive Policy: Manual
Updated Inactive Date: Apr 24, 2025
Original Inactive Date: Jun 12, 2025
Initiative: None
Classification
Original Set Aside:
Product Service Code: Y1DA - CONSTRUCTION OF HOSPITALS AND INFIRMARIES
NAICS Code: 237310 - Highway, Street, and Bridge Construction
Place of Performance:
Documents
Tender Notice
Mill-and-Fill_Site-Visit-for-Solicitation-Attend.pdf
Curb-Detail.pdf
Sidewalk-Detail.pdf
36C24225B0009-0002.docx
S02-Mill-Fill-2024-v5-FLATENED-Copy.pdf
S02-Specifications_Mill-and-Fill-Northport-Parking.pdf
36C24225B0009-0001.docx
Drawings.pdf
Specifications-Mill-and-Fill-Northport-Parking-Lot.pdf
SOW_Mill-and-Fill-Northport-Parking-Lots-Phase-2.pdf
FAR-52.pdf
VA-Parking-Design-Manual-Demand-Model.pdf
VA-NOTICE-OF-LIMITATIONS-ON-SUBCONTRACTING-CERTIFI.pdf
36C24225B0009.docx