Procurement Summary
Country : USA
Summary : Po-75 Labranch Marsh Creation, Louisiana
Deadline : 17 Feb 2023
Other Information
Notice Type : Tender
TOT Ref.No.: 78171992
Document Ref. No. : 12FPC323R0001
Competition : ICB
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Description
Amedment 03 - Provides 30 attachments to the SF30 Amendment of Solicitation form to include (1) Question and Response document, (2) Sign in from Site Visit, (3) Revised Pricing Schedule, (4) Revised Construction Specifications 21 (5) Revised Construction Specification 421; (6) Geotechnical Reports, (7) Magnetometer surveys and reports, (8) Scenic River Permit and (9) USCOE Permits. See Attachment S01 12FPC323R0001 AM03 and referenced attachments.
Amendment 02 - Provided a revised pricing schedule and established date for receipt of questions. See Attachment S01 12FPC323R0001 AM02
Amendment 01 - Provided a revised solicitation package removing and adding clauses. See Attachment S01 12FPC323R0001 AM01
PO-75 LaBranch Marsh Creation, Lousiana
The project-s goal is to restore marsh that has been converted to open water. Project implementation will result in an increase of wildlife and fisheries habitat, acreage and diversity, along with improving water quality. In addition, the project will provide a storm buffer protection to Interstate 10 (I-10), the region-s primary westward hurricane evacuation route, and complement hurricane protection measures in the area. The project features consist of the creation of 1, 200 acres of marsh using dedicated dredging from Lake Pontchartrain. In addition, 6, 540 linear feet of tidal creeks will be created. Located in St Charles Parrish, closest City is Norco, Louisiana.
A firm fixed price construction contract is anticipated. Performance time is 524 calendar days from from the issuance of the Notice to Proceed (NTP).
This requirement is Unrestricted, a subcontracting plan will be required prior to award by the successful offeror if the offeror is other than small business.
Active Contract Opportunity
Notice ID : 12FPC323R0001
Related Notice : 12FPC323R0001
Department/Ind. Agency : AGRICULTURE, DEPARTMENT OF
Sub-tier : FARM PRODUCTION AND CONSERVATION BUSINESS CENTER
Office : FPAC BUS CNTR-ACQ DIV
General Information
Contract Opportunity Type: Solicitation (Updated)
All Dates/Times are: (UTC-06:00) CENTRAL STANDARD TIME, CHICAGO, USA
Updated Published Date: Jan 31, 2023 11:53 am CST
Original Published Date: Jan 04, 2023 08:32 am CST
Updated Date Offers Due: Feb 17, 2023 02:00 pm CST
Original Date Offers Due: Feb 07, 2023 02:00 pm CST
Inactive Policy: Manual
Updated Inactive Date: Apr 30, 2023
Original Inactive Date: Feb 22, 2023
Initiative: None
Classification
Original Set Aside:
Product Service Code: Y1KZ - CONSTRUCTION OF OTHER CONSERVATION AND DEVELOPMENT FACILITIES
NAICS Code: 237990 - Other Heavy and Civil Engineering Construction
Place of Performance: Norco, LA USA
Documents
Tender Notice
S01-12FPC323R0001-AM03.pdf
1.-LaBranche-Marsh-Creation-Project-PO-75--Questions-amp-Responses.pdf
2.-Site-Showing-Sign-in-PO-75-18Jan2023.pdf
3.-Revised-Schedule-of-Pricing-12FPC323R0001-AM03.pdf
4.-Revised-Construction-Spec-21--Excavation--Amend-3--Jan-2023.pdf
5.-Revised-Construction-Spec-421--ECD-for-Marsh-Creation--Amend-3--Jan-2023.pdf
6.-PO-75-Geotechnical-Report-Revised-5.26.2017.pdf
6.-PO-75-MCBA-Geotechnical-Report-12.1.2011.pdf
6.-PO-133-Geotechnical-Report-4.11.2014.pdf
7.-Labranche-East-Marsh-Creation--Complete-Drawing-Set.pdf
7.-PO75-100408-Survey-Report.pdf
7.-PO75-Benchmark-Datasheet.pdf
7.1-PO75-100408-1--Marsh-Creation-Topo.pdf
7.1-PO75-100408-2--Ave-Marsh-Elevations.pdf
7.1-PO75-100408-3--MC-Utility-amp-Boring-Locations.pdf
7.1-PO75-100408-4-19-Marsh-Creation-Cross-Sections.pdf
7.1-PO75-100408-20-25--SDL-and-SCD-Sections.pdf
7.2-PO75-100408-1--Borrow-Area-Bathymetric-Survey-Plan-View.pdf
7.2-PO75-100408-2-6--Borrow-Area-Cross-Sections.pdf
7.3-PO75-100408-1--Borrow-Area-Mag-Plan-View-west-half--full-size.pdf
7.3-PO75-100408-1--Borrow-Area-Mag-Plan-View-west-half.pdf
7.3-PO75-100408-2--Borrow-Area-Mag-Plan-View-east-half--full-size.pdf
7.3-PO75-100408-2--Borrow-Area-Mag-Plan-View-east-half.pdf
7.3-PO75-100408-3--Borrow-Area-Magnetic-Contours.pdf
7.3-PO75-100408-4--Borrow-Area-Mag-Gamma-Table.pdf
7.4-PO-133-Mag-Survey-of-Access-Drawings.pdf
7.4-PO-133-Mag-Survey_Report.pdf
8.-PO-75-Scenic-River-Permit-1178.pdf
9.-PO-75-USCOE--MVN-2012-1081-EPP-PERMIT.pdf
9.-PO-133-USCOE--MVN-2012-1081-2-EPP-PERMIT.pdf
S01-12FPC323R0001.pdf
S01-Attachment-1-Specifications--July-2022revised.pdf
S01-Attachment-2-Drawings.pdf
S01-Attachment-3-Wage-Determinations.pdf
S01-Attachment-4-Past-Performance-Questionnaire.docx
S01-12FPC323R0001-AM01.pdf
S01-12FPC323R0001-AM02.pdf