Procurement Summary
Country : Switzerland
Summary : Renovation of the Etzelwerk Power Plant: Generator / Turbine / Turbine Pump Sb Ag in Infrastruktur Einkauf Energie
Deadline : 26 Jul 2024
Other Information
Notice Type : Tender
TOT Ref.No.: 103111168
Document Ref. No. : 1429689
Competition : ICB
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
The ETZELWERK power station on SBB is a pumping-winding plant that uses the level difference between the Sihlsee and the Lake Zurich. The installation was put into service in the 1930s and was then enlarged in stages. After obtaining the 2023 concession for the continuation of the exploitation of the hydraulic forces between the lakes of Sihl and Zurich, the installation of the power plant must be partially renewed and the parts of the installation at the end of a technical life must Be replaced. As part of the Etzelwerk power plant renewal project, SBB predicted to partially replace the motor waterway and replace three of the seven groups of machines from the Altendorf power station with new ones.
Applicant service/contracting entity: SBB Ag In infrastruktur EINKAUF Energieservice Organizer/Organizing entity: SBB AG IN INFRASTRUKTU EINKAUF ENERGIE, for the attention of Marc Stettler, Hilfikerstrasse 3, 3000 BERN 65, Switzerland, Telephone: 00, E-mail: Einkauf.energie @sbb.ch, url www.sbb.ch
Publish Date: 24.06.2024
Subject of the market
2.1 Title of the market project: renovation of the Etzelwerk power plant: generator / turbine / turbine pump
2.3 Common vocabulary of public procurement:
2.4 Object and extent of the market: The ETZELWERK power plant of SBB is a pumping-rebuilding power station which uses the level difference between the Sihlsee and the Lake Zurich. The installation was put into service in the 1930s and was then enlarged in stages. After obtaining the 2023 concession for the continuation of the exploitation of the hydraulic forces between the lakes of Sihl and Zurich, the installation of the power plant must be partially renewed and the parts of the installation at the end of a technical life must be replaced. As part of the Etzelwerk power plant renewal project, SPFs plan to partially replace the motor water and replace three of the seven groups of machines from the Altendorf power plant with new.
2.5 Place of supply: Altendorf, Sz
2.6 Market divided in lots?: No
2.8 Are variants admitted?: No:
2.9 Party offers ...
Documents
Tender Notice