Procurement Summary
Country : Belgium
Summary : Renovation of the Lillo Bridge
Deadline : 20 Nov 2024
Other Information
Notice Type : Tender
TOT Ref.No.: 92439595
Document Ref. No. : 703798-2023
Competition : ICB
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Object of these works: Renovation of the Lillo Bridge. Explanation: The Lillo Bridge is a rail and cyclist bridge over the canal dock at the Tijsmans tunnel. The bridge dates from 1967 and consists of 6 steel spans, 4 fixed and 2 movable, which are of the Strauss type. The 2 beweighable parts interlock and together span a passage width of 86m between the concrete pillars. Over the years it has become apparent that the bridge is more subject to fatigue than initially estimated, resulting in cracking in the balances. The cracks have often been repaired as oplaster, until the bridge was taken out of service for safety reasons in 2019. Port of Antwerp-Bruges has decided to thoroughly renovate the Lillo Bridge so that it can be used again as a railway bridge. This involves a thorough renovation of the bridge. The main works that will be carried outare: Dismantling and assembling the movable bridges and fixed spans and steel constructionconnection, to check the sensors by Infrabel;oApplication of reinforcements in the context of fatigue;oRemoval of rails from inspection gondolas;oSmall steel repairs (Footpath supports, pendulum connections, etc.)oReplacing footpath grids with plastic grids;-Fixed spans...
Document Type: Contract Notice
Reference Number: B11136
Contract Type: works
Doc Title: Renovatie van de Lillobrug
Dispatch Date: 2023-11-16
Publish Date: 2023-11-20
Submission Date: 2024-11-20
Documents
Tender Notice