Procurement Summary
Country : Germany
Summary : Repair of Water Supply and Sanitation Systems
Deadline : 29 Feb 2024
Other Information
Notice Type : Tender
TOT Ref.No.: 95139724
Document Ref. No. : BMZ201366467/KfW510766
Competition : ICB
Financier : KFW Bankengruppe (German Development Bank)
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Tenders are invited for Repair of Water Supply and Sanitation Systems in Lezha.
Intended services
Water supply:
in Shengjin, Koder Malekaj (Lezha) areas and Kakarriq and Gocaj villages:
Delivery and installation of a total of around 29 km of water distribution network pipes with a diameter of ≤ OD225PE and main supply lines of 3.82 km DN500DCI or 660 m OD110PE, including butt/electric welded connections, valves, domestic water meters, fire hydrants, around 960 house connections in PE-RC OD20-63, including delivery and installation of electro-magnetic large water meters for consumption zone measurement.
Construction of 2 new wells and rehabilitation of 2 existing wells, including delivery and installation of submersible pumps and equipment for pressure surge protection, disinfection, power supply and SCADA. Construction of a new water tank 400 m3, new construction of a water tank 1, 000 m3, construction of a new booster pumping station - including pipes, valves and accessories, power supply and SCADA equipment. Setting up a local control system (SCADA) for pumping stations and wells, as well as connecting to the existing central SCADA system.
Sanitation measures in Lezha:
Wastewater: Construction/renovation of ~1, 300 m sewage network ID250-1000PE incl. ~46 shafts (PE) and ~1380m house connection pipes DN200 with ~130 house connection wells (PE). Construction of 7 spillway structures. Renovation of 2 wastewater pumping stations including pumps ≤75 kW, pipes, valves, accessories, and all mechanical, electrical / SCADA equipment and work.
Rainwater: Exchange / delivery and installation of a total of approx. 2, 655 m of pipes: approx. 760 m of PE corrugated pipes ID300-1200; ~1, 540m box profile ≤1.94x1.5m, ~290m pressure pipes OD1200PE and ~65m open trapezoidal duct 3.0x4.5m, incl. ~ 90 shafts, sand/gravel traps and curb inlets. Construction of 27 high-performance inlet shafts as well as ~2, 340 m of DN200 house connection pipes and ~234 house connection shafts (PE) on mixed sewer sections. Construction of a new main rainwater pumping station 3m3/s including pumps, pipes, valves, accessories, and all mechanical, electrical / SCADA equipment and works.
Wastewater treatment plant: Construction of a new influent pumping station, a new fine screen building, a new venturi channel, new aerated sand and grease separation basins with blowers, a new biofilter and a new phosphorus removal plant, including all structural, mechanical, electrical / SCADA equipment and works.
Wastewater treatment plant: Construction of a new influent pumping station, a new fine screen building, a new Venturi Parshall flume, new aerated sand and grease chambers with blowers, a new biofilter and a new phosphorus removal plant, including all civil, mechanical and electrical works
[Disclaimer: The above text is machine translated. For accurate information kindly refer the original document.]