PDVSA PETROLEO SA has floated a tender for Replacement and Assembly of the Metal Structures Associated with Air Coolers E-6015 (a \/b \/c \/d \/e \/f \/g \/h \/i \/j \/k) of the Vacuum Plant of the Dyr Unit in the El Palito Refinery (phase .... The project location is Venezuela and the tender is closing on 20 May 2024. The tender notice number is A-194-24-0033, while the TOT Ref Number is 100922814. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Venezuela

Summary : Replacement and Assembly of the Metal Structures Associated with Air Coolers E-6015 (a \/b \/c \/d \/e \/f \/g \/h \/i \/j \/k) of the Vacuum Plant of the Dyr Unit in the El Palito Refinery (phase ...

Deadline : 20 May 2024

Other Information

Notice Type : Tender

TOT Ref.No.: 100922814

Document Ref. No. : A-194-24-0033

Competition : ICB

Financier : Self Financed

Purchaser Ownership : Public

Tender Value : Refer Document

Purchaser's Detail

Name :Login to see tender_details

Address : Login to see tender_details

Email : Login to see tender_details

Login to see details

Tender Details

Replacement and assembly of the metal structures associated with air coolers E-6015 (A \/B \/C \/D \/E \/F \/g \/h \/i \/j \/k) of The Vacuum Plant of the DyR unit in the El Palito Refinery (Phase II)

The work called replacement and assembly of the metal structures associated with air coolers E-6015 (A/B/C/D/E/F/G/H/I/J/K) of the unit vacuum plant of Dyr in the El Palito Refinery - Phase II, consists of the execution of civil, electric, rotary and metalworking activities in general, such as bay disassembly, electric disconnection and motion disassembly, disassembly of fan of fan, dismantling, dismantling, Repair, reconstruction, manufacture, replacement and installation of metal structures, mechanical cleaning by abrasive jet, application of anti -corrosive paint coating to metal structures, localized withdrawal from the fire lining (Fireproofing) to facilitate the removal of structural elements, tests and tests, Among other activities, associated with air coolers during the programmed plant stop of the Distillation and Reform Unit of the El Palito Refinery. The time D ...