Procurement Summary
Country : Canada
Summary : Rfi 01-2025 Design-Build Services - Supply and Site Integration of Four (4) 25Kv Floating E-Houses
Deadline : 05 Feb 2025
Other Information
Notice Type : Tender
TOT Ref.No.: 112942614
Document Ref. No. : 01-2025
Competition : ICB
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
This Request for Information is for the purposes of gathering information from the marine electrical, steel fabrication, and ship building industry to ascertain the interest and capability to design-build marine electrical and marine structural infrastructure (the “Services”) for the Island Class Terminal Electrification Program (the “Program”). The Program will introduce four (4) rapid-charging facilities on two inter-island routes (Route 19-Nanaimo Harbour-Gabriola Island & Route 23-Campbell River - Quathiaski Cove), allowing the new plug-in hybrid diesel-electric Island Class vessels, currently under construction, to operate in full electric mode. BC Ferries has identified the e-house solution to be an integrated power assembly within a steel pontoon designed for placement in salt water for the entire duration of its design life (“floating e-house”).
Solicitation Type : RFI - Request for Information (Informal)
Reference Number : 00004366621
Location : British Columbia
Purchase Type : Not Stated
Dates Publication : 2025/01/09 01:59:00 PM EST
Closing Date : 2025/02/05 05:00:00 PM EST
Contact Information : Procurement
: procurement@bcferries.com
:
Description : This Request for Information is for the purposes of gathering information from the marine electrical, steel fabrication, and ship building industry to ascertain the interest and capability to design-build marine electrical and marine structural infrastructure (the “Services”) for the Island Class Terminal Electrification Program (the “Program”). The Program will introduce four (4) rapid-charging facilities on two inter-island routes (Route 19-Nanaimo Harbour-Gabriola Island & Route 23-Campbell River – Quathiaski Cove), allowing the new plug-in hybrid diesel-electric Island Class vessels, currently under construction, to operate in full electric mode. BC Ferries has identified the e-house solution to be an integrated power assembly within a steel pontoon designed for placement in salt water for the entire duration of its design life (“floating e-house”).
Documents
Tender Notice