Procurement Summary
Country : Switzerland
Summary : Rfi Power Plant Renewal Etzelwerk: Generator / Turbine / Storage Pump Sbb Ag Infrastructure Purchasing Energy
Deadline : 26 Jul 2024
Other Information
Notice Type : Tender
TOT Ref.No.: 103111167
Document Ref. No. : 1429683
Competition : ICB
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
The SBB power plant is a pumped memory and uses the gradient between Sihlsee and Lake Zurich. The facility was put into operation in the 1930s and then expanded in stages. After receiving the concession in 2023 for the further use of the water forces between Sihlsee and Zurichsee, the power plant is to be partially renewed and replaced parts of the company at the end of the technical life. As part of the Etzelwerk power plant renewal, SBB AG provides for partly replacing the drive water path and replacing three of the seven machine groups in the headquarters in Altendorf with new ones.
Demand/awarding authority: SBB AG Infrastructure Purchasing Energy creation center/organizer: SBB AG Infrastructure purchasing energy, to HDN. by Marc Stettler, Hilfikerstrasse 3, 3000 Bern 65, Switzerland, phone: 00, email: shopping.energie@sbb.ch, url www.sbb.ch
Publish Date: 24.06.2024
Procurement object
2.1 Project title of procurement: RFI power plant renewal Etzelwerk: generator / turbine / storage pump
2.3 Community vocabulary:
2.4 The subject and scope of the order: The Etzelwerk power plant of the SBB is a pumped storage facility and uses the gradient between the Sihlsee and Lake Zurich. The facility was put into operation in the 1930s and then expanded in stages. After receiving the concession in 2023 for the further use of the water forces between Sihlsee and Zurichsee, the power plant is to be partially renewed and replaced parts of the company at the end of the technical life. As part of the power plant renewal Etzelwerk, SBB AG provides for partly replacing the drive water path and replacing three of the seven machine groups in the headquarters in Altendorf with new ones.
2.5 Place of delivery: Altendorf, SZ
2.6 Division in lots?: No
2.8 Are variants approved?: No:
2.9 Are partial offers approved? : No:
2, 10 Delivery date: Start 01.01.2026 and at the end of December 31, 2032: