Procurement Summary
Country : Canada
Summary : Rfq - Survey Services Red River & Multibeam Sonar & Lidar & Bridge Structure
Deadline : 17 Apr 2025
Other Information
Notice Type : Tender
TOT Ref.No.: 117141285
Document Ref. No. : RFQ-ETS-HF-329
Competition : ICB
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
The Government of Manitoba, as represented by the Minister of Transportation and Infrastructure, requests Quotes from qualified Proponents meeting the requirements contained in this Request for Quotes (RFQ) to: Conduct multibeam sonar bathymetric survey of the riverbed, and LiDAR survey (minimum of100 meters from each bank) to capture detailed topographic data for hydraulic modeling of Lower Red River. Perform survey of bridge structures, including the collection of structural data (e.g., deck elevation, underside girder elevation, number of spans, pier width, number of piers & pier location, and abutments) to assess potential impacts on hydraulic conditions. In addition to the xYZ survey data, the bridge components (numbers and sizes) mentioned above should also be documented in thespreadsheet.
Reference Number : 0000290640
Location : Canada, Manitoba, Winnipeg
Purchase Type : Duration: 10 month(s)
Description : The Government of Manitoba, as represented by the Minister of Transportation and Infrastructure, requests Quotes from qualified Proponents meeting the requirements contained inthis Request for Quotes (RFQ) to: Conduct multibeam sonar bathymetric survey of the riverbed, and LiDAR survey (minimum of 100 meters from each bank) to capture detailed topographic data for hydraulic modeling of Lower Red River. Perform survey of bridge structures, including the collection of structuraldata (e.g., deck elevation, underside girder elevation, number of spans, pier width, number of piers & pier location, and abutments) to assess potential impacts on hydraulic conditions. In addition to the xYZ survey data, the bridge components (numbers and sizes) mentioned above should also be documentedin the spreadsheet. :
Documents
Tender Notice