Procurement Summary
Country : Ireland
Summary : Rft for the Installation of a Thin Board Double-Up Station at Line 1 Press Outfeed and Replacement Transport Carriage in L1 Storage Field at Medite Europe Dac‘25
Deadline : 19 Feb 2025
Other Information
Notice Type : Tender
TOT Ref.No.: 114075224
Document Ref. No. : 4954262
Competition : ICB
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
MEDITE Europe DAC are seeking suitably qualified Mechanical Engineering companies to install a Transport Carriage and a Thin board Doubling-up station at their plant at Medite Europe DAC, Redmondstown, Clonmel, Co. Tipperary. Part 1. Installation of thin board Double-Up station at Line 1 Press outfeed MEDITE Europe DAC requires the installation of a board transport / thin board Doubling-up station between L1 Press exit and the 1 board cooler, to accommodate master panel of different sizes. This is composed of 3 connected belt conveyors, a thin board blocking mechanism (pneumatic) and some local control panels mounted on it. It is 9655mm in total length and 3139 in width. It will replace the existing roller-conveyor and similarly will be located above existing angled conveyor (staying) into the board-breaker. Its legs will be on same footprint, sitting outside those of angled conveyor. Installation will first require removal of the roller conveyor. The OEM supplying the system is Kontra AG. It is envisaged that removal of existing roller conveyor and replacement with Double-Up station will take place during Line1 annual shutdown (ASD) in June 2025 (Wks. 24 + 25). Removal of old conveyor, mechanical installation of new one and connection of services is to take place in the first week of ASD. Electrical works / programming will be completed by Medite/Kontra during second week of ASD. The expected duration of the ASD (downtime) will be 12 days. This will be followed by approximately 5 days of testing + commissioning during 1st week after restart of production (Wk 26), during which the contractor needs to be available to support onsite and troubleshoot and rectify any issues that may arise during HO. The OEM (Kontra) will supply a Mechanical fitter, an Electrical technician and an e-Tech/PLC programmer to oversee the works. Access platforms, stairs and ladders to current conveyor are non-compliant with latest EN standard. The successful bidder will be responsible for the...
Procedure : Open
Publication Date : 19/02/2025
Deadline : 19/02/2025 15:00:00
Documents
Tender Notice