Procurement Summary
Country : USA
Summary : Sam Gordy's Slough Dredging and Habitat Project
Deadline : 11 Mar 2025
Other Information
Notice Type : Tender
TOT Ref.No.: 114679274
Document Ref. No. : 25-500-20
Competition : ICB
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Bid Synopsis: All referenced figures can be found in the attached Narrative file, found in the supplementary documents section. Mississippi River backwaters within Pool 6 are currently a high priority resource for WI DNR due to a general lack of deep, backwater habitat within the pool (Figure 2). Recent flood and high discharge conditions have resulted in declining water quality conditions due to an influx of channel sand into the main inlet to the complex. The channel inlet at RM 624.5 is currently blocked by sediment during normal and low flow conditions. This channel flows under a bridge into the middle of the complex during above normal river stages and can have a positive influence on WQ conditions in deeper water located along the tracks in the lower portion of the complex when flow is present. However, reduced flow delivery to the system results in periods when winter water quality conditions are outside temperature and dissolved oxygen ranges required for overwintering backwater fish communities. Recent surveys conducted under near-median discharge conditions indicated widespread hypoxia in the complex (Figure 3). Fish kills in Sam Gordy-s Slough are likely to occur in the coming years if no action is taken. Water Quality monitoring conducted by the WI DNR identifies hydraulic connectivity as the primary water quality driver in Sam Gordy-s Slough. A detailed rating curve has been developed for inflows into Sam Gordy-s Slough (Figure 4). When main chan...
Available Date: 2/12/2025
Due Date : 3/11/2025 2:00:00 PM
Documents
Tender Notice