WATER SECURITY AGENCY has floated a tender for Structural Health Monitoring Instrument Installation at Buffalo Pound and Theodore Dams. The project location is Canada and the tender is closing on 01 Aug 2024. The tender notice number is WSA-2024-25-0075, while the TOT Ref Number is 104122760. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Canada

Summary : Structural Health Monitoring Instrument Installation at Buffalo Pound and Theodore Dams

Deadline : 01 Aug 2024

Other Information

Notice Type : Tender

TOT Ref.No.: 104122760

Document Ref. No. : WSA-2024-25-0075

Competition : ICB

Financier : Self Financed

Purchaser Ownership : Public

Tender Value : Refer Document

Purchaser's Detail

Name :Login to see tender_details

Address : Login to see tender_details

Email : Login to see tender_details

Login to see details

Tender Details

The purpose of this project is to implement a structural health monitoring (SHM) program at Buffalo Pound Dam Control Structure and Theodore Dam Spillway. This information will be used to further assess all structural considerations required for the performance and safety of the dams going forward. The project will be divided into two phases: Phase 1 will include a background study, site inspections, and review of current design drawings and relevant documents of the existing proposed instrumentation plans. A memo will be submitted summarizing SHM installation recommendations to WSA for review and acceptance. Phase 2 will include the procurement and installation of the accepted SHM installations at each of the dam sites. A brief factual report summarizing the field installation work, including instrumentation information, will be submitted to WSA for review and acceptance.
The purpose of this project is to implement a structural health monitoring (SHM) program at Buffalo Pound Dam Control Structure and Theodore Dam Spillway. This information will be used to further assess all structural considerations required for the performance and safety of the dams going forward. The project will be divided into two phases: Phase 1 will include a background study, site inspections, and review of current design drawings and relevant documents of the existing proposed instrumentation plans. A memo will be submitted summarizing SHM installation recommendations to WSA for review and acceptance. Phase 2 will include the procurement and installation of the accepted SHM installations at each of the dam sites. A brief factual report summarizing the field installation work, including instrumentation information, will be submitted to WSA for review and acceptance.
Additional Information:
WSA is a Treasury Board Crown corporation within the meaning of The Crown Corporations Act, 1993 (Saskatchewan) that is governed by The Water Security Agency Act (Saskatchewan). WSA is responsible for water management in the Province of Saskatchewan, which includes managing the Province’s water supply, protecting water quality, ensuring safe drinking water and the treatment of wastewater, reducing flood and drought damage, protecting aquatic habitat, and managing dams and related supply channels.
Competition Type: Request for Quotation

Open Date : Jul 12, 2024 03:00 PM CST
Close Date : Aug 01, 2024 04:00 PM CST

Documents

 Tender Notice