Procurement Summary
Country : Germany
Summary : Study: Control Concept of Power Flow Controlling Equipment
Deadline : 09 Mar 2021
Other Information
Notice Type : Tender
TOT Ref.No.: 50131267
Document Ref. No. : 149256
Competition : ICB
Financier : Self Financed
Purchaser Ownership : -
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Description: In a passive transmission network, the active power flows on the lines are usually set according to the effective line impedances. As a result, the active power flows cannot be directly influenced. In order to increase transmission capacities that are not yet fully used, consideration is given to integrating power flow-controlling equipment (e.g. phase-shifting transformers or equipment based on power electronics) into the transmission system. A superordinate control concept is required so that error-free interaction of several such operating resources is ensured not only in normal operation but also in the event of a fault. This control concept must also be robust enough to integrate power flow control equipment with control time constants of different sizes. The present request for quotation should discuss the question on which the planned study is based and detail its objectives. References to a possible scientific methodology for the development of the objective as well as a possible appropriate structure of the work are given where it appears appropriate. E ...
Documents
Tender Notice