Procurement Summary
Country : USA
Summary : Windtunnel Piping Installation
Deadline : 17 Jan 2025
Other Information
Notice Type : Tender
TOT Ref.No.: 112634598
Document Ref. No. : W15QKN-25-x-13I9
Competition : ICB
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Description
This is a Sources Sought (SS) issued by the Army Combat Capabilities Development Command (DEVCOM), Armaments Center (AC), Munitions Engineering & Technology Center (METC) and Aeroballistics Division. This effort is for information to plan an acquisition strategy and contract to install piping to support a hypersonic windtunnel upgrade. Responders to this SS notice are asked to provide capability statements related to experience with the ability to furnish the following requirements for high powered industrial air and pipe systems:
Quantity of (2) 350-PSIG (oil filled screw type) in-door air compressors must be piped approximately 75-feet into quantity of (2) remote out-door air coolers. Pipe must penetrate through concrete wall to go outside from compressor room and must be properly mounted, supported, and sealed. Piping from compressor to cooler must be 2-½-inch diameter, include 2-½-inch hand-operated ball valve at compressor outlet, include mount and support. Confirm ball valve. Ensure pipe fitting and size are correct. Ensure equipment is tested for leaks, properly secured and sealed, and safe for operation. Separate in and out lines must be piped between compressors and coolers to cool the oil. In-line pipe specifications from compressor to cooler must be 2-inch diameter, include 2-inch hand-operated ball valve at compressor outlet, include mount and support. Out-line pipe specifications from cooler to compressor must be 2-inch diameter, include mount and support, include 2-inch hand-operated ball valve at compressor inlet. The in and out lines between compressors and coolers must be manifolded together with a single ½-inch pipe. Oil lines that run outdoors must include heat tracer. Ensure proper fluids are added to the oil lines with required amount of manufactured approved oil. Ensure pipe fitting and size are correct. Ensure equipment is tested for leaks, properly secured and sealed, and safe for operation. Quantity of (2) remote out-door...
Active Contract Opportunity
Notice ID : W15QKN-25-x-13I9
Related Notice
Department/Ind. Agency : DEPT OF DEFENSE
Sub-tier : DEPT OF THE ARMY
Office: W4MK CCDC ARMAMENTS CENTER
General Information
Contract Opportunity Type: Sources Sought (Original)
Original Published Date: Jan 02, 2025 10:51 am EST
Original Response Date: Jan 17, 2025 04:00 pm EST
Inactive Policy: 15 days after response date
Original Inactive Date: Feb 01, 2025
Initiative: None
Classification
Original Set Aside:
Product Service Code: J045 - MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT
NAICS Code: 23822 - Plumbing, Heating, and Air-Conditioning Contractors
Place of Performance:
Documents
Tender Notice